WHAT'S NEW
- Order
in Case No. 97 of 2009 dated 3-Sept-2010 Petition
filed by The Tata Power Company Ltd.'s Transmission Business'
(TPC-T), for approval of truing up of Aggregate Revenue
Requirement for FY 2008-09, Annual Performance Review for
FY 2009-10 and Aggregate Revenue Requirement for FY 20
- Order
in Case No. 100 of 2009 dated 3-Sept-2010 Petition
filed by Reliance Infrastructure Ltd.'s Transmission Business'
(RInfra-T) Petition for Truing Up of Aggregate Revenue Requirement
for FY 2008-09, Annual Performance Review for FY 2009-10
and Determination of Revenue Requirement for FY 2010-11
- Order
in Case No. 1 of 2010 dated 1-Sept-2010 Brihan-Mumbai
Electric Supply and Transport (BEST) Undertaking's Petition
seeking approval of Power Purchase Agreement between BEST
and TPC for 100 MW
- Order
in Case No. 117 of 2008 dated 1-Sept-2010 Petition
seeking approval of the Power Purchase Agreements of MSEDCL
with NTPC, SPV of UMPP and RGPPL
- Order
in Case No. 32 of 2009 dated 1-Sept-2010 Petition
for approval of deviations taken in Request for Qualification
(RFQ) issued to bidders, from Standard Bidding Document
issued by Ministry of Power (MoP), for development of Yavatmal
project under International Competitive Bidding Process
(Case II)
- Order
in Case No. 93 of 2008 dated 1-Sept-2010 Petition
of Akhil Bhartiya Grahak Panchayat, Latur seeking directions
against MSEDCL for non-compliance of the Electricity Supply
Code Regulations and the Electricity Act, 2003
- Order
in Case No. 9 of 2010 dated 25-August-2010 Petition
seeking modification of present Interim Balancing and Settlement
Mechanism (IBSM) with Final Balancing and Settlement Mechanism
(FBSM)
- Order
in Case No. 94 of 2009 dated 6-August-2010 Petition
In the matter of Petition filed by MSETCL for approval of
MSLDC Budget for FY 2010-11
- Order
in Case No. 3 of 2010 dated 3-August-2010 Complaint
filed by M/s. Paul Strips & Tubes Pvt. Ltd., against
Maharashtra State Electricity Distribution Company Ltd.,
alleging non-compliance of the Electricity Ombudsman's Order
dated 03.02.2010, and seeking refund of Tariff differencey
- Order
in Case No. 4 of 2010 dated 3-August-2010Complaint
filed by M/s. Mundra Steel & Alloy Pvt. Ltd., against
Maharashtra State Electricity Distribution Company Ltd.,
alleging non-compliance of the Electricity Ombudsman's order
dated 04.02.2010 and seeking refund of Tariff Differenc
- Order
in Case No. 92 of 2009 dated 3-August-2010 Petition
filed by M/s. Ispat Industries Limited seeking Clarification
of Tariff Orderdated 18.05.2007 and Clarification thereto
issued by MERC, in viewof Order dated 13.11.2009 passed
by the Appellate Tribunal for Electricity
- Order
in Case No. 49 of 2009 dated 3-August-2010 PeMaharashtra
State Electricity Distribution Company Ltd. (MSEDCL)'s Petition
seeking review of Order dated June 15, 2009 in the matter
of implementing Zero Load Shedding model for the area covered
under Pen Circle and for approval of Reliability Charges
to be recovered thereofd
- Order
in Case No. 16 of 2010 dated 3-August-2010 Petition
of Tata Power Company Limited seeking directions against
letters dated 16-5-2010 and 18-5-2010 issued by MSLDC And
In the matter of Complaint under Section 142 of the Electricity
Act, 2003
- Order
in Case No. 12 of 2010 dated 19-July-2010 PetPetition
of Maharashtra Elektrosmelt Ltd. seeking clarification of
Commission's CPP Order dated September 8, 2004 in Case No.
55 & 56 of 2003 read with Commission's Order dated August
17, 2009 in Case No. 116 of 2008
- Order
in Case No. 14 of 2009 dated 19-July-2010 In
the matter of Complaint filed by Shri. P.S. Ballani alleging
non-compliance of Order dated 28.01.2009 passed by the CGRF
Kalyan Zone
- Order
in Case No. 93 of 2009 dated 19-July-2010 Petition
filed by MSEDCL seeking approval of project for the supply
of power above 10 MVA and 22 kV level through Independent
dedicated distribution facility at Rajiv Gandhi Infotech
park, Hinjewadi
- Order
in Case No. 15 of 2010 dated 19-July-2010 Petition
of The Tata Power Company Ltd. regarding dispute in grant
of excavation rights for laying of HT (Electrical) Cables
- Order
in Case No. 113 of 2009 dated 19-July-2010 Proposal
of MSEDCL for change in methodology of levy of Fuel Adjustment
Cost (FAC)
- Order
in Case No. 20 of 2010 dated 14-July-2010 Determination
of Generic Tariff under Regulation 8 of the Maharashtra
Electricity Regulatory Commission (Terms and Conditions
for Determination of Renewable Energy Tariff) Regulations,
2010
- Order
in Case No. 2 of 2010 dated 10-July-2010 Petition
of M/S Abhijeet MADC Nagpur Energy Pvt. Ltd. seeking clarification
regarding non - requirement of Transmission Licence for
laying Dedicated transmission Line by a Generating Company
- Order
in Case No. 21 of 2010 dated 1-July-2010 Designating
the State Agency to undertake functions as envisaged in
Maharashtra Electricity Regulatory Commission (Renewable
Purchase Obligation, its Compliance and REC Framework Implementation)
Regulations, 2010.
- Order
in Case No. 82 of 2009 dated 01-June-2010 Maharashtra
State Electricity Distribution Company Ltd. (MSEDCL)'s Petition
seeking clarification on implementation of Commission's
Order dated 30th November 2009 in Case No. 31 of 2009, for
procurement of power on RTC basis for withdrawal of load
shedding in the headquarters of Revenue Divisions
- Order
in Case No. 75 of 2007 dated 01-June-2010 Petition
filed by M/s Mahratta Chamber of Commerce, Industries and
Agriculture with regard to supply on single point to commercial
building/industrial complexes for mixed load
- Order
in Case No. 90 of 2009 dated 28-May-2010 Maharashtra
State Electricity Distribution Company Ltd. (MSEDCL)'s Petition
for Additional scenario of Load Shedding Protocol.
- Order
in Case No. 105 of 2009 dated 24-May-2010 Dodson-Lindblom
Hydro Power Pvt. Ltd.'s Petition for re-determination of
Tariff for 34 MW Bhandardara Hydro project- Phase II
- Order
in Case No. 62 of 2009 dated 24-May-2010 MSEDCL's
Petition for In-principle approval of MoU route for selection
of Distribution Franchisee and Bulk Supply Tariff (BST)
for the area to be developed under Township Policy/ SEZ
policy/ Industrial Policy
- Order
in Case No. 89 of 2009 dated 24-May-2010 Maharashtra
State Electricity Distribution Company Ltd. (MSEDCL)'s Petition
for determination of additional cost as Reliability Charge
for withdrawal of load shedding in the Thane II Urban Region
including Kalwa sub-division
- Order
in Case No. 16 of 2009 dated 24-May-2010 Petition
filed by M/s. MSEDCL seeking permission for withdrawal of
load shedding in respect of feeder/Sub-station for evacuation
of power from Non-Conventional Energy sources
- Order
in Case No. 110 of 2009 dated 24-May-2010 Maharashtra
State Electricity Distribution Company Ltd. (MSEDCL)'s Petition
for determination of Reliability Charge for withdrawal of
Load Shedding in the District Headquarters of MSEDCL Licence
area
- Order
in Case No. 142 of 2008 dated 24-May-2010 Petition
of M/s. Ixora Constructions Private Limited (ICPL) for Grant
of Distribution License, under Section 14 of the Electricity
Act, 2003 and Regulation 5 of MERC (General Conditions of
Distribution License) Regulations, 2006, for upcoming SEZ
in Panvel
- Order
in Case No. 74 of 2009 dated 13-May-2010 MSEDCL's
Petition seeking approval of Power Purchase Agreements signed
between MSEDCL and MSPGCL for procurement of power from
250 MW Parli (Unit-7) and 250 MW Paras (Unit- 4)
- Order
in Case No. 106 of 2009 dated 12-May-2010 Petition
filed by Maharashtra State Electricity Distribution Co.
Ltd. for procurement of power from Solar projects)
- Order
in Case No. 116 of 2008 dated 12-May-2010 ClARIFICATORY
ORDER Petition seeking approval of Power Purchase
Agreements signed between MSEDCL and MSPGCL for procurement
of power from 250 MW Parli (Unit-7) and 250 MW Paras (Unit-
4)
- Order
in Case No. 118 of 2008 dated 12-May-2010 ClARIFICATORY
ORDER Petition filed by Brihan-Mumbai Electricity
Supply and Transport Undertaking (BEST) for approval of
Truing Up for FY 2007-08, Annual Performance Review for
FY 2008-09 and determination of ARR and Tariff for FY 2009-10
- Order
in Case No. 113 of 2008 dated 12-May-2010 ClARIFICATORY
ORDER The Tata Power Company Limited - Distribution
Business' (TPC-D) Petition for Truing Up for FY 2007-08,
Annual Performance Review for FY 2008-09 andTariff Determination
for FY 2009-10
- Order
in Case No. 121 of 2008 dated 12-May-2010 ClARIFICATORY
ORDER Reliance Infrastructure Ltd. Distribution
Business' (RInfra-D) Petition for Truing Up for FY 2007-08,
Annual Performance Review for FY 2008-09 and Tariff Determination
for FY 2009-10
- Order
in Case No.77 of 2009 dated 11-May-2010 Petition
of M/s. Jaigad Power Transco Ltd. for approval of the assignment
of Transmission License to the lenders.
- Order
in Case No. 34 of 2009 dated 11-May-2010 Petition
of University of Pune seeking re-categorisation from HT
II Commercial to HT I Industrial (Non-Continuous), in view
of the Appellate Tribunal's Judgment dated May 21, 2009
in Appeal No. 48 of 2009
- Order
in Case No.76 of 2009 dated 26-Apr-2010 In the matter
of Petition of Maharashtra State Electricity Distribution
Company Ltd. seeking approval for installing Prepaid Energy
Meters and other reliefs.
- Order
in Case No.70 of 2009 dated 23-Apr-2010 In the matter
of Petition filed by M/s Pidilite Industries Pvt. Ltd. seeking
clarification of Order dated November 24, 2003 in Case No.
17 (3), 3,4,5 of 2002 passed by the Commission.
- Order
in Case No.104 of 2009 dated 13-Apr-2010 In the
matter of Maharashtra State Electricity Distribution Company
Ltd.’s (MSEDCL) Petition For Approval of Deviations taken
in the Request for Proposal (RFP) from the Standard Bidding
Document issued by Ministry of Power for Competitive Bidding
Process under Case-I, to be issued to Bidders for procurement
of 1000 (+/- 20% ) MW base Load Power on Medium Term Basis
under International Competitive Bidding Process (Case 1)
- Order
in Case No.75 of 2009 dated 13-Apr-2010 In the matter
of Clarification of Order dated November 24, 2003 in Case
No. 17 (3), 3,4,5 of 2002.
- Order
in Case No.88 of 2009 dated 8-Apr-2010 In the matter
of Complaint filed by M/s Shivalik Ventures Pvt. Ltd. against
Reliance Infrastructure Ltd., alleging non-release of new
electricity connections for want of recovery of arrears
of unknown slum dwellers and non-compliance of Section 43
of EA, 2003.
- Order
in Case No.10 of 2007 dated 1-Apr-2010 In the matter
of Application filed by MSEDCL initiating enquiry in respect
of revocation / suspension of licence of MPECS.
- Order
in Case No.109 of 2009 dated 1-Apr-2010 In the matter
of Petition of M/s. Power Controls, Nagpur seeking directions
upon MSEDCL regarding Vendor’s Registration for the supply
of Distribution Transformer of 63, 100 and 200 kVA, 11/0.433
kV Class
- Order
in Case No.116 of 2009 dated 31-Mar-2010 In the
matter of Extension of applicability of Tariff Orders for
Renewable Energy Projects till issuance of new Tariff Orders
for the next Control Period (FY 2010-11 to FY 2015-16)
- Order
in Case No.115 of 2009 dated 31-Mar-2010 In the
matter of Maharashtra State Electricity Distribution Company
Ltd. (MSEDCL)’s Petition for continuation of Billing as
per existing Tariff Order dated 17.08.2009 upto the issue
of new Tariff Order.
- Order
in Case No.101 of 2009 dated 30-Mar-2010 In the
matter of Approval of bid documents prepared by The Brihan-Mumbai
Electric Supply & Transport Undertaking (BEST)for Long Term
Power Procurement from Renewable Sources.
- Order
in Case No.64 of 2009 dated 29-Mar-2010 In the matter
of Indo Rama Synthetics (I) Limited for payment of dues
for injection of excess power into the MSETCL network.
- Order
in Case No.1 of 2009 dated 25-Mar-2010 In the matter
of Non-compliance of Order dated 31.05.2008 in Case No.
72 of 2008 and Order dated 03.03.2007 in Case Nos. 50, 55,
56 of 2006
- Order
in Case No.36 of 2008 dated 25-Mar-2010 In the matter
of Petition filed by M/s. Kendriya Vihar Co-operative Housing
Federation Ltd. under Section 43, 45, 46 and 86 of the Electricity
Act, 2003 for refund of SLC and to treat the ORC Scheme
of MSEDCL as null and void
- Order
in Case No.40 of 2009 dated 15-Mar-2010 In the
matter of Petition filed by Reliance Infrastructure Ltd.
and others under Section 17(3) of the Electricity Act, 2003
and Regulation 8.3.10 of Maharashtra Electricity Regulatory
Commission (General Conditions of Distribution License)
Regulations, 2006.
- Order
in Case No.40 of 2009 dated 15-Mar-2010 In the
matter of Petition filed by Reliance Infrastructure Ltd.
and others under Section 17(3) of the Electricity Act, 2003
and Regulation 8.3.10 of Maharashtra Electricity Regulatory
Commission (General Conditions of Distribution License)
Regulations, 2006.
- Order
in Case No.71 of 2009 dated 5-Mar-2010 In the matter
of MSEDCL’s Proposal for levy of Voltage Surcharge to consumers
who are supplied power at lower than prescribed voltage
as per SoP Regulations.
- Order
in Case No.26 of 2009 dated 5-Mar-2010 In the matter
of MRVGS’ Petition for non-compliance of the Tariff Order
dated 20.06.2008 read with earlier Orders dated 20.10.2006
and 18.05.2007, passed by the Commission.
- Order
in Case No.16 of 2008 dated 5-Mar-2010 In the matter
of Truing up process for Maharashtra State Power Generation
Company Ltd.s (MSPGCL) Generating Stations for FY
2005-06, FY 2006-07 and FY 2007-08 based upon Appellate
Tribunals Judgment in Appeal No. 86 and 87 of 2007
and CPRI Report and Provisional Truing up for FY 2008-09.
- Order
in Case No.91 of 2009 dated 5-Mar-2010 In the matter
of Petition of Shri Major General S. C. N. Jatar Retd. in
regard to illegal occupation of premises / completion certificate
from Urban Local Body (ULB) and seeking complete overhaul
of system of allotment of domestic and commercial connections
with an amendment to MERC Regulations.
- Order
in Case No.45 of 2009 dated 2-Mar-2010 In the matter
of Petition of Shree Mahivara Jaina Vidyalaya seeking dispensation
from HT-II Commercial category.
- Order
in Case No.80 of 2009 dated 25-Feb-2010 In the
matter of Complaint filed by M/s. Shri Radha Sarveshwar
Laminates (P) Ltd., Nagpur, against MSEDCL under Section
142 of Electricity Act, 2003 alleging non-compliance of
the Order dated 17.10.2005 passed by the CGRF, Nagpur Urban
Zone.
- Order
in Case No.79 of 2009 dated 25-Feb-2010 In the
matter of Complaint filed by M/s. Pooja Packwell (I) Ltd.,
Nagpur, against MSEDCL under Section 142 of Electricity
Act, 2003 alleging non-compliance of the Order dated 17.10.2005
passed by the CGRF, Nagpur Urban Zone.
- Order
in Case No.60,81,83,84,85 & 86 of 2009 dated 22-Feb-2010
In the matter of Petitions seeking changeover from
BEST Undertaking to Tata Power Company Limited.
- Order
in Case No.78 of 2009 dated 22-Feb-2010 In the
matter of Review of Order dated 27.10.2008.
- Order
in Case No.10 of 2007 dated 8-Feb-2010 In the matter
of Application filed by MSEDCL initiating enquiry in respect
of revocation / suspension of licence of MPECS.
- Order
in Case No.69 of 2009 dated 3-Feb-2010 In the matter
of Petition filed by Bombay Oxygen Corporation Ltd., Mumbai,
complaining against MSEDCL for wrongful charging of Additional
Supply Charge and other charges.
- Order
in Case No.18 & 19 of 2009 dated 3-Feb-2010
MSEDCL's Petition for continuation of zero load shedding
model for Thane and Vashi and for approval of Reliability
Charges to be recovered thereof. (Case No. 18 of 2009) and
MSEDCL's Petition for continuation of zero load shedding
model for Pune and for approval of Reliability Charges to
be recovered thereof. [Case No. 19 of 2009]
- Order
in Case No.73 of 2009 dated 3-Feb-2010 Application
filed by Shri Randhir Dar seeking clarification
with regard to Regulation 4.1(a) of the MERC (Consumer Grievance
Redressal Forum and Electricity Ombudsman) Regulations,
2006.
- Order
in Case No.16 of 2008 dated 19-Jan-2010 Miscellaneous
Application filed by M/s. Maharashtra State Power Generation
Co. Ltd
- Order
in Case No.35 of 2009 dated 19-Jan-2010 In the matter
of The Tata Power Company Limited's Petition for Approval
of Capital Cost and Determination of Tariff for Trombay
Unit No. 8
- Order
in Case No.21 of 2009 dated 11-Jan-2010 In the matter
of Petition of Vidarbha Industries Association seeking review
of Commission’s Order dated March 23, 2009 in Case No. 10
of 2008
- Order
in Case No.123 of 2008 dated 11-Jan-2010 In the
matter of Petition filed by Cogeneration Association of
India for review of the tariff rate and tariff structure
for Bagasse based Grid Connected Cogeneration Projects.
- Order
in Case No.6 of 2009 dated 8-Jan-2010 In the matter
of Petition filed by M/s. Ind-Bharat Energies (Maharashtra)
Ltd., seeking termination of Biomass Energy Purchase Agreement
dated 18.10.2006.
- Order
in Case No.63 of 2009 dated 7-Jan-2010 In the matter
of Maharashtra State Electricity Distribution Company Ltd.'s
(MSEDCL) Petition seeking review of Commission's Order dated
August 17, 2009 in Case No. 116 of 2008.
- Order
in Case No.67 of 2009 dated 31-Dec-2009 In the matter
of Petition filed by Shri Charbhuja Sales Corporation against
MSEDCL for non-compliance of Order dated 24.11.2003 passed
by the Commission.
- Order
in Case No.11 of 2009 dated 30-Dec-2009 In the matter
of Petition of Association of Hospitals, Educational Institutions
and Charitable Trusts seeking re-determination of the tariff,
in view of the Appellate Tribunal’s Judgment dated
April 23, 2009, in Appeal Nos. 153, 154, 155, 156, 157,
158, 159, 161, 162, 164, 165, 166, 167, 168, 170, 174, 175,
176, 177 and 178 of 2008 .
- Order
in Case No.72 of 2009 dated 24-Dec-2009 In the matter
of Application filed by MSEDCL proposing amendment to Regulation
4.1(a) of the MERC (Consumer Grievance Redressal Forum and
Electricity Ombudsman) Regulations, 2006, related to appointment
of Chairperson of CGRF .
- Order
in Case No.103 of 2007 dated 24-Dec-2009 In the
matter of Complaint filed by Dr. Sachin Saoji seeking directions
under Section 142 of the EA2003 against MSEDCL for non-compliance
of the order of CGRF, Aurangabad Zone dated 29.01.2007 .
- Order
in Case No.105 of 2008 dated 24-Dec-2009 In the
matter of Petition of MSEDCL seeking approval of PPA between
MSPGCL and MSEDCL for the sale and purchase of power from
the proposed 2x500 MW Bhusawal TPS expansion project.
- Order
in Case No.58 of 2009 dated 22-Dec-2009 In the matter
of Approval of recovery of infrastructure charge on account
of conversion of Low Tension/ High Tension overhead distribution
network to underground
- Order
in Case No.116 of 2008 dated 21-Dec-2009 In the
matter of Maharashtra State Electricity Distribution Company
Ltd.'s (MSEDCL) Petition for Truing Up for FY 2007-08, Annual
Performance Review for FY 2008-09 and Tariff Determination
for FY 2009-10
- Order
in Case No.68 of 2009 dated 21-Dec-2009 In the matter
of Complaint filed by Shri Surendra Bharamu Magdum alleging
non-compliance of Order dated 14.07.2008 passed by the CGRF
Kolhapur Zone.
- Order
in Case No.36 of 2009 dated 19-Dec-2009 In the matter
of Complaint filed by Maula Sheku Nadaf under Section 142
of the Electricity Act, 2003 against MSEDCL for non-compliance
of Order dated 16.02.2008 passed by the Commission in Case
No. 56 of 2007
- Order
in Case No.30 of 2009 dated 19-Dec-2009 In the matter
of Petition seeking clarification of MERC’s Order dated
24-Nov-2003, with respect to applicability of the order
to “Self-Use/ Third Party Sale".
- Order
in Case No.42 of 2009 dated 16-Dec-2009In the matter
of Complaint filed by M/s. Tungabhadra Holding Private Limited
under Section 142 of the Electricity Act, 2003 against MSEDCL-II,
Kalyan for non-compliance of Order dated 19.01.2009 passed
by the CGRF, Kalyan Zone.
- Order
in Case No.95 of 2008 dated 15-Dec-2009In the matter
of Maharashtra State Power Generation Company Limited's
(MSPGCL) Petition for determination of tariff for Paras
Unit No. 3.
- Order
in Case No.54 of 2009 dated 15-Dec-2009 In the matter
of Petition filed by M/s. Deepak Fertilizers and Petrochemicals
Ltd. seeking clarification with respect to re-classification
of the tariff category of the petitioner from HT-I (Noncontinuous)
to HT-II (Commercial) pursuant to Order dated June 6, 2008
passed in Case No. 72 of 2007 (MSEDCL APR Order) by the
Commission.
- Order
in Case No.44 of 2009 dated 15-Dec-2009 In the matter
of BEST Undertaking’s Petition seeking review of APR Order
dated June 15, 2009 in Case No. 118 of 2009.
- Order
in Case No.43 of 2009 dated 14-Dec-2009 In the matter
of Petition filed by M/s Clover Solar Pvt Ltd for determination
of Tariff for Grid connected solar based Power Plant.
- Order
in Case No.25 of 2009 dated 14-Dec-2009 In the matter
of Provision for recovery of Arbitration claim being payable
to M/s Datar Switch Gear Ltd.
- Order
in Case No.83 of 2008 dated 14-Dec-2009 Petition
filed by Maharashtra Biomass Energy Developers Association
seeking review of variable charge component of the Cost
of Generation determined under Orders dated August 8, 2005
(Case No. 37 of 2003) and July 19, 2006 (Case No. 37 of
2005).
- Order
in Case No.51 of 2009 dated 14-Dec-2009 In the matter
of Joint Petition of Water Resource Department and MSPGCL
seeking issuance of advice to transfer existing Veer Hydro
Power Station to Water Resource Department
- Order
in Case No.116 of 2008 dated 9-Dec-2009IN THE MATTER
OF Maharashtra State Electricity Distribution Company Ltd.'s
(MSEDCL) Petition for Truing Up for FY 2007-08, Annual Performance
Review for FY 2008-09 and Tariff Determination for FY 2009-10
- Order
in Case No.151 of 2008 dated 9-Dec-2009 In the matter
of Petition filed by M/s. Cipla Cancer & AIDS Foundation
seeking reliefs as per ATE's Judgment dated 16.02.2009
- Order
in Case No.66 of 2009 dated 9-Dec-2009 In the matter
of Petition filed by Smt. Jeevankala Harinamsingh Pardeshi
against MSEDCL, Kalyan, for non-compliance of Order passed
by the CGRF, Kalyan Zone dated 10.02.2009.
-
- Order
in Case No.53 of 2009 dated 7-Dec-2009 In the matter
of Petition filed by Shri Amarjeet R. Upadhyaya seeking
review of Commission's Order dated 15 June 2009 in Case
No. 13 of 2009.
- Order
in Case No.61 of 2009 dated 3-Dec-2009 In the matter
of Maharashtra State Electricity Distribution Company Ltd.'s
(MSEDCL) Petition for recovery of additional capacity charges
of Ratnagiri Gas and Power Pvt. Ltd.
- Order
in Case No.55 of 2009 dated 2-Dec-2009 In the matter
of Petition of M/s. Maharashtra Dyeing and Printing Works
against Electricity Ombudsman's Order dated 29.09.2008
- Order
in Case No.31 of 2009 dated 30-Nov-2009 In the matter
of Maharashtra State Electricity Distribution Company Ltd.
(MSEDCL)’s Petition for determination of Additional Supply
Charge for withdrawal of Load Shedding in the Headquarters
of Revenue Divisions in MSEDCL Licence Area.
- Order
in Case No.57 of 2009 dated 23-Nov-2009 In the matter
of Petition of Shri Haroon Noor Mohd. Memon against Electricity
Ombudsman’s Order dated 05.12.2008.
- Order
in Case No.52 of 2009 dated 23-Nov-2009 In the matter
of Petition filed by The Tata Power Company Ltd. for implementation
of Order dated 2nd February, 2009 in Case 46 of 2008 and
Order dated 15th June, 2009 in Case 113 of 2008
- Order
in Case No.29 of 2009 dated 23-Nov-2009 In the matter
of Petition of M/s Mumbai International Airport Ltd. seeking
re-determination of the tariff, in view of the Appellate
Tribunal’s Judgment dated 26.02.2009 in Appeal No. 106 of
2008
- Order
in Case No.144 of 2008 dated 9-Nov-2009 In the matter
of Petition filed by Maharashtra State Electricity Distribution
Company Limited (MSEDCL) for approval of methodology for
refund of Additional Supply Charges (ASC) to consumers on
a one-to-one basis.
- Order
in Case No.37 of 2009 dated 10-Nov-2009 In the matter
of Petition of Shri Anwar Ahmed A. Aziz, Nashik against
the non compliance of the Order dated 14.05.2008 passed
by the CGRF, Nashik.
- Order
in Case No.14 of 2009 dated 29-Oct-2009 In the matter
of Complaint filed by Shri. P.S. Ballani for non-compliance
of Order dated 28.1.2009 passed by the CGRF Kalyan Zone.
- Order
in Case No.26 of 2008 dated 21-Oct-2009 -In the
matter of Maharashtra State Power Generation Company Limited's
(MSPGCL) Petition for Determination of Tariff for Parli
Unit No. 6
- Order
in Case No.124 of 2009 dated 15-Oct-2009 -In the
matter of Application filed by Maharashtra State Electric
Power Trading Company Pvt. Ltd., seeking grant of Intra-State
Trading License.
- Order
in Case No.50 of 2009 dated 15-Oct-2009 -In the
matter of Petition filed by Tata Power Company Ltd - Distribution
(TPC-D) seeking approval of operating procedures for supplying
power to consumers in the common area of license of Reliance
Infrastructure Ltd. - Distribution (RInfra-D), using each
other's existing distribution network [Errata
and Corrigendum] dated on 29 Oct 2009
- Order
in Case No.47 of 2009 dated 14-Oct-2009 -In the
matter of Petition of Shri. Kedar Achyut Joshi against Electricity
Ombudsman's Order dated 5.6.2009
- Order
in Case No.41 of 2009 dated 7-Oct-2009 -In the matter
of Petition of Shri Vikram Sunderdas Setiya challenging
a Notice dated 20.04.2009 issued under Section 42 of EA
2003
- Order
in Case No.38 of 2009 dated 28-Sept-2009 -In the
matter of Application seeking approval to transfer existing
Veer Hydro Power Station to Water Resource Department, Government
of Maharashtra and undertake renovation and modernisation
of the same through private participation
- Order
in Case No.46 of 2009 dated 10-Sept-2009 -In the
matter of Petition filed by Reliance Infrastructure Ltd.
Distribution Business (RInfra-D) for Clarifications on Tariff
Order issued by the Commission on RInfra-D's APR Petition
for FY 2008-09 in Case No. 121 of 2008
- Order
in RInfra-D of 2009 dated 8-Sept-2009 -In the matter
of Investigation of Reliance Infrastructure Ltd. Distribution
Business (RInfra-D) under Section 128 of the Electricity
Act, 2003
- Order
in Case No.1 of 2009 dated 17-Aug-2009 -In the matter
of Non-compliance of the Commission's Order dated May 31,
2008 and March 3, 2007.
- Order
in Case No.116 of 2008 dated 17-Aug-2009 -IN THE
MATTER OF Maharashtra State Electricity Distribution Company
Ltd.'s (MSEDCL) Petition for Truing Up for FY 2007-08, Annual
Performance Review for FY 2008-09 and Tariff Determination
for FY 2009-10
- Order
in Case No.23 of 2009 dated 17-Aug-2009
-In the matter of Review of Order dated 4.03.2009 passed
in Case No. 107 of 2008.
- Order
in Case No.22 of 2009 dated 17-Aug-2009
-In the matter of Petition of Saibaba Constructions
Co., regarding supplementary bills from MSEDCL on account
of theft.
- Order
in Case No.139 of 2008 dated 17-Aug-2009
-In the matter of Petition for refund of excess recovery
of Additional Supply Charge by MSEDCL and violation of direction
of the Commission by MSEDCL and for initiation of proceedings
under Section 142 of the Electricity Act 2003.
- Order
in Case No.127 of 2008 dated 17-Aug-2009
-In the matter of Brihan Mumbai Electric Supply and
Transport (BEST) Undertaking's Petition seeking approval
of quantum of power procurement through Competitive Bidding
Process.
- Order
in Case No.82&86 of 2008 dated 17-Aug-2009
-In the matter of Petition of M/s. Thane Small Scale
Industries Association for indiscriminate increase in load
shedding hours by MSEDCL. [Case No. 82 of 2008] and Petition
of Prayas (Energy Group) and M/s. Sajag Nagrik Manch, Pune
for indiscriminate increase in load shedding hours by MSEDCL.
[Case No. 86 of 2008]
- Order
in Case No.9 of 2008 dated 17-Aug-2009
-In the matter of MSEDCL's Petition seeking approval
of the agreement for Standby Support by MSEDCL to TPC, REL
and BEST.
- Order
in Case No.115 of 2009 dated 17-Aug-2009
-In the matter of Maharashtra State Power Generation
Company Ltd.'s (MSPGCL) Petition for approval of Truing
up for FY 2007-08, Annual Performance Review for FY 2008-09
and Determination of Tariff for FY 2009-10
- Order
in Case No.136 of 2009 dated17-Aug-2009
-In the matter of Petition filed by Pudumjee Pulp &
Paper Mills Ltd. seeking permission to comply with RPS obligation
cumulatively for the period from FY 2007-08 till FY 2009-10
- Order
in Case No.147 of 2009 dated17-Aug-2009
-In the matter of Clarification about the Commission's
directions contained in its order dated 05-05-2000 in Case
No. 1 of 1999 regarding Service Line Charges (SLC) and its
interpretation and implementation by MSEB/MSEDCL
- Order
in Case No.149 of 2009 dated17-Aug-2009
-In the matter of Petition filed by M/s. Tata Motors
Ltd., and M/s. Nishkalp Energy Ltd., seeking directives
for formulation of special terms for open access applicable
for wind energy projects, falling under Group II (post expiry
of 8 years period).
- Order
in Case No.148 of 2009 dated17-Aug-2009
-In the matter of Implementation of the Commission's
Order dated 24.11.2003 in Case No.17 (3), 3, 4, 5 of 2002,
Order dated 12.09.2003 in Case No.10 of 2006 and Judgment
dated 05.02.2008 by the Appellate Tribunal of Electricity
in Appeal No.15 of 2007 for the payment of interest by MSEDCL
on delayed payments for energy off taken.
- Order
in Case No.5 of 2009 dated17-Aug-2009
-In the matter of Petition filed by M/s Great Eastern
Plaza Condominium regarding single point supply to commercial
building/ industrial complexes for mixed use.
- Order
in Case No.4 of 2009 dated17-Aug-2009
-In the matter of Petition of M/s Indo Rama Synthetics
(India) Ltd., alleging wrongful action of MSLDC of withdrawing
standing clearance and imposing restraint on IEX from accepting
supplies from the Petitioner
- Order
in Case No.104,122and125 of 2008 dated 7-Aug-2009
-In the matter of Petitions seeking waiver of RPS under
the Commission's Order dated 16.8.2006 in Case No. 6 of
2006 and / or review thereof.
- Order
in Case No.24 of 2009 dated 6-Aug-2009
-In the matter of Petition filed by Shri. M. H. Kakkad
appealing against Electricity Ombudsman's order dated Feb.
02, 2009 on wrong assessment/ Average Billing by Torrent
Power Ltd., Franchisee of MSEDCL.
- Order
in Case No.33 of 2009 dated 4-Aug-2009
-In the matter of Brihan Mumbai Electric Supply and
Transport (BEST) Undertaking's Petition seeking approval
of quantum of power purchase and deviations/references taken
in Standard Bidding Documents for procurement of power on
Long Term Basis
- Order
in Case No.67 of 2008 dated 4-Aug-2009
-In the matter of Petition filed by M/s BF Utilities
Limited, seeking clarification of the Commission's Order
dated November 20, 2007, determining Open Access Charges
on wind energy projects.
- Order
in Case No.28 of 2009 dated23-July-2009
-In the matter of Maharashtra State Electricity Distribution
Company Ltd.'s (MSEDCL) Petition for Approval of Deviations
taken in the Bid Documents from the Standard Bidding Document
issued by Ministry of Power for Competitive Bidding Process
under Case-I Bidding for procurement of 2000 MW base load
power on Long-Term Basis.
- CLARIFICATORY
ORDER in Case No.121 of 2008 dated 22-July-2009
-In the matter of Reliance Infrastructure Ltd. Distribution
Business' (RInfra-D) Petition for Truing Up for FY 2007-08,
Annual Performance Review for FY 2008-09 and Tariff Determination
for FY 2009-10.
- CLARIFICATORY
ORDER in Case No.113 of 2008 dated 22-July-2009
-In the matter of The Tata Power Company Limited - Distribution
Business' (TPC-D) Petition for Truing Up for FY 2007-08,
Annual Performance Review for FY 2008-09 and Tariff Determination
for FY 2009-10.
- Order
in Case No.94 of 2008 dated21-July-2009 -Reliance
Infrastructure Limited- Distribution Business's Petition
for Approval of proposed quantum of power for Medium-Term
Power Procurement through Competitive Bidding route via
Case-I and approval of Bid Documents
- Order
in Case No.137 of 2008 dated15-July-2009 -Reliance
Infrastructure Limited- Distribution Business's Petition
for
Approval of Proposed Quantum of power for Long-Term Power
Procurement through Competitive Bidding route via Case-I
and approval of Bid Documents.
- Order
in Case No.121 of 2008 dated 15-July-2009 - Reliance
Infrastructure Ltd. Distribution Business' (RInfra-D) Petition
for Truing Up for FY 2007-08, Annual Performance Review
for FY 2008-09 and Tariff Determination for FY 2009-10
- Order
in Case No.27 of 2008 dated 8-July-2008 - IDodson-Lindblom
Hydro Power Pvt. Ltd.'s Petition for determination of tariff
for Bhandardara Hydro Power Project-II (34 MW).
- Order
in Case No.9 of 2009 dated 7-July-2008 - In
the matter of Petition of M/s Indo Rama Synthetics (India)
Ltd for wrongful rejection by MSLDC of the Petitioner's
request to inject additional power.
- Order
in Case No. 37 of 2008 dated 7-July-2008 - Petition
filed by MSEDCL seeking damages for willful breach of EPA
by Purti Sakhar Karkhana Ltd.
- Order
in Case No. 138 of 2008 dated 6-July-2008 - Application
of M/s. Adani Power Maharashtra Limited for grant of Transmission
Licence for development of 400 kV Tiroda - Koradi and Tiroda
- Warora double circuit Transmission lines
- Order
in Case No. 11&38 of 2009 dated 19-Jun-2009
- In the matter of Non-payment of actual dues arising out
as per the Commission's Order dated November 24, 2003, and
Non-payment/inappropriate payments by MSEDCL to the developers
of Wind Power Energy
- Order
in Case No. 8 of 2009 dated 15-Jun-2009 - In the
matter of Petition filed by Mahindra Lifespace Developers
challenging a provisional order of assessment issued under
Section 126 of the EA 2003
- Order
in Case No. 13 of 2008 dated 15-Jun-2009 - Petition
filed by Shri. Amarjeet Upadhyaya seeking release of electricity
connection and related complaint against MSEDCL.
- Order
in Case No. 121 of 2008 dated 15-Jun-2009 - Reliance
Infrastructure Ltd. Distribution Business' (RInfra-D) Petition
for Truing Up for FY 2007-08, Annual Performance Review
for FY 2008-09 and Tariff Determination for FY 2009-10
- Order
in Case No. 113 of 2008 dated 15-Jun-2009 - The
Tata Power Company Limited - Distribution Business' (TPC-D)
Petition for Truing Up for FY 2007-08, Annual Performance
Review for FY 2008-09 and Tariff Determination for FY 2009-10
- Order
in Case No. 118 of 2008 dated 15-Jun-2009 -Petition
filed by Brihan-Mumbai Electricity Supply and Transport
Undertaking (BEST) for approval of Truing Up for FY 2007-08,
Annual Performance Review for FY 2008-09 and determination
of ARR and Tariff for FY 2009-10
- Order
in Case No. 143 of 2008 dated 15-Jun-2009 -Petition
filed by Maharashtra State Electricity Distribution Company
Limited for implementing Zero Load Shedding model for the
area covered under Pen Circle and for approval of Reliability
charges to be recovered thereof.
- Order
in Case No. 111 of 2008 dated 28-May-2009 - In the
matter of Petition of The Tata Power Company Ltd. Generation
Business' (TPC-G) for approval of Truing up for FY 2007-08,
Annual Performance Review for FY 2008-09 and Determination
of Tariff for FY 2009-10
- Order
in Case No. 120 of 2008 dated 28-May-2009 - In the
matter of Petition of Reliance Infrastructure Ltd. Generation
Business' (RInfra-G) for approval of Truing up for FY 2007-08,
Annual Performance Review for FY 2008-09 and Determination
of Tariff for FY 2009-10
- Order
in Case No. 155 of 2008 dated 28-May-2009 - Determination
of Transmission Tariff for Intra-State Transmission System
(InSTS) for the third year of the MYT Control Period (i.e.,
FY 2009-10)
- Order
in Case No. 119 of 2008 dated 28-May-2009 - Reliance
Infrastructure Ltd. Transmission Business' (RInfra-T) Petition
for Annual Performance Review for FY 2008-09 and Determination
of Revenue Requirement for FY 2009-10
- Order
in Case No. 114 of 2008 dated 28-May-2009 - Maharashtra
State Electricity Transmission Company Ltd.'s (MSETCL) Petition
for approval of Annual Performance Review for FY 2008-09
and Aggregate Revenue Requirement for FY 2009-10
- Order
in Case No. 112 of 2008 dated 28-May-2009 - The
Tata Power Company Ltd.- Transmission Business' (TPC-T),
for approval of truing up of Aggregate Revenue Requirement
for FY 2007-08, Annual Performance Review for FY 2008-09
and Aggregate Revenue Requirement for FY 2009-10
- Order
in Case No. 90,91,98 and 99 of 2009 dated 27-May-2009
- Petition for initiating action under Sections 142 and
146 of the EA 2003 against MSEDCL for non-compliance of
the Order dated 23.04.2007 and Order dated 28.05.2007 and
Petition for initiating action under Sections 142 and 146
of the EA 2003 against MSEDCL for Non-compliance of the
Order with respect to the Principles and Protocols of Load
Shedding and for imposing additional load shedding on the
industrial and agricultural consumers.
- Order
in Case No. 135 of 2008 dated 25-May-2009 - Complaint
of M/s. Teleflo Instrument Co. Pvt Ltd., raising grievance
against Electricity Ombudsman's Order dated 15.9.2008 and
against RInfra
- Order
in Case No. 71 of 2008 dated 25-May-2009 - Petition
filed by BF Utilities Ltd., for adjudication of dispute
regarding provision of non-discriminatory open access
- Order
in Case No. 68 of 2008 dated 25-May-2009 - Petition
filed by M/s. REDAM seeking review of Transmission and Wheeling
Charges for Open Access by Wind Energy Generators
- Order
in Case No. 48 of 2008 dated 25-May-2009 - Petition
of M/s. Rake Power Ltd., seeking adjudication of dispute,
grant of compensation, third party sale, and open access
- Order
in Case No. 84 of 2008 dated 22-May-2009 - Petition
filed by Eurotex Industries and Exports Ltd., for reduction
of Contract Demand at its plant E- 1, MIDC, Gokul Shirgaon,
Kolhapur from 900 kVA to 100 kVA.
- Order
in Case No. 73 of 2008 dated 20-May-2009 - Complaint
filed by Shri. Ramesh Eknath Manjule under Section 142 of
EA 2003 for Non compliance of the CGRF order dated 26.07.2007
- Order
in Case No. 106 of 2008 dated 20-May-2009 - Complainant
filed by Shri. Sonumal Sunil Kumar alleging non-complaince
of order dated 5.4.2008 passed by CGRF, Bhandup Urban Zone,
Bhandup
- Order
in Case No. 10 of 2009 dated 15-May-2009 - MSETCL's
Petition for extension of existing Tariff with effect from
April 1, 2009, up to issuance of new Tariff Order for FY
2009-10
- Order
in Case No. 02 of 2009 dated 11-May-2009 - Extension
of Tariff Order dated May 31, 2008 read with Errata and
Corrigendum dated September 5, 2008 up to issuance of new
Tariff Order for FY 2009-10
- Order
in Case No. 07 of 2009 dated 11-May-2009 - Petition
filed by MSEDCL regarding Shifting of LT/HT network due
to road widening, development etc. and conversion of over
head LT/HT network to underground system
- Order
in Case No. 100 of 2008 dated 8-May-2009 - Tariff
for Solar based Power Generation Projects within Maharashtra
under MNRE Scheme.
- Order
in Case No. 117 of 2008 dated 29-Apr-2009 - Petition
filed by MSETCL for approval of MSLDC Budget for FY 2009-10
- Order
in Case No. 152,153 and 154 of 2008 dated 15-Apr-2009
- PetitionExtension of applicability of Tariff Orders of
RInfra-G, T and D, TPC-G, T and D and BEST Undertaking till
issuance of new Tariff Orders
- Order
in Case No. 126 of 2008 dated 9-Apr-2009 - Petition
Petition filed by MSEDCL seeking review of Order dated 14.11.2008
passed in Case No. 61 of 2008.
- Order
in Case No. 109 of 2008 dated 08-Apr-2009 - Petition
filed by M/s The Tata Power Company Limited-Distribution
business for approval of power purchase for Quarter-2 and
Quarter-3 of FY 2008-09 under Regulation 25 of the MERC
(Terms and Conditions of Tariff) Regulations, 2005
- Order
in Case No. 103 of 2008 dated 02-Apr-2009 - Petition
filed by M/s. Maharashtra State Electricity Distribution
Company Ltd. (MSEDCL) for levy of Fuel Adjustment Cost (FAC)
charge proportionate to the base tariff
- Order
in Case No. 88 of 2008 dated 02-Apr-2009 - Petition
filed by M/s. Kay Power and Paper Ltd., seeking review of
Order dated 6.8.2002 in the matter of purchase of power
from Bagasse based Co- generation
- Order
in Case No. 69 of 2008 dated 02-Apr-2009 - Petition
filed by Association of Hospitals, Pune, seeking review
of the Order dated June 20, 2008 in Case No. 72 of 2007
- Order
in Case No. 146 of 2008 dated 01-Apr-2009 - MSEDCL's
Petition to grant permission for continuation of billing
as per existing Tariff Order dated 20.06.2008 in Case No.
72 of 2007, up to the issue of new Tariff Order.
|