World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Colaba, Mumbai-400 005
Telephone No. : 091-22-2216 3964/65/69, Fax : 091-22-2216 3976
Email : mercindia@merc.gov.in



Events for October , 2018

To view copy of Event Notice Click on Underlined HOUR
2018
10:00

Petition of Shah Lulla Estate Developers (SLED) Sangli under Section 86 (1) (f) of the Electricity Act, 2003 for recovery of petitioner's outstanding payments for sale of wind energy and interest on delayed payments due from MSEDCL under the appropriate provisions of Energy Purchase Agreement signed with them.

 

[79 of 2018]
 

 

  10:00

Petition of BLP Wind Project (Amberi) Private Limited against Maharashtra State Electricity Distribution Company Ltd. under Section 86 (1)(f) of the Electricity Act, 2003 over disputes regarding non-payment of outstanding dues including late payment surcharge.

 

[125 of 2018]
 

 

  10:00

Petition of M/s. Bothe Windfarm Development Private Limited seeking remittance and release of the due and payable monthly invoices raised upon MSEDCL by M/s. Bothe Windfarm Development Private Limited towards power supplied till date under various Energy Power Purchase Agreements.

 

[185 of 2018]
 

  

 

  10:00

Petition of Sun-N-Sand Hotels Pvt Limited under Section 86(1)(f) for adjucation of dispute on the issue of outstanding payments, of delayed payment surcharge and of interest on delayed payment surcharge by the Respondent

 

[188 of 2018]
 

 

  10:00

Petition of Maharashtra State Electricity Distribution Co. Ltd.(MSEDCL) under Section 86 (1) (f), (k) and other applicable provisions of the EA, 2003 and in connection with the dispute and differences arising under the standby power agreements dated 13.06.2014, 29.08.2015, 30.06.16 executed between Global Energy Pvt. Ltd. and MSEDCL.

 

[78 of 2018]
 

  

 

  10:00

Petition of Spentex Industries Limited to amend the provisions of Load Factor Incentive under the Tariff Order.

 

[158 of 2018]
 

  10:00

Petition of Petition of Spentex Industries Ltd. for Arbitrary Levy of Wheeling Charges & Applicable Loss for the Financial Year 2015-2016 and Financial Year 2016-2017 in contradistinction to provisions of Electricity Act, 2003 and Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations 2014 and Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations 2015.

 

[159 of 2018]
 

  

  10:00

Petition of Laxmi Organic Industries Limited under Section 142 of Electricity Act, 2003 for non compliance of order dated 02.04.2018 passed in Case No.97 of 2016.

 

[168 of 2018]
 

  

  10:00

Review Petition of M/s Topworth Urja and Metals Limited under Sections 94 of the Electricity Act, 2003 Read With Regulation 85,92,93,94 and 95 of the MERC (Conduct of Business) Regulations, 2004 Review of the Order dated 4th May, 2018 passed in Case No.5 of 2016.

 

[174 of 2018]
 

  

 

  10:00

Petition of Spentex Industries Limited for Arbitrary Levy of Wheeling Charges & applicable Wheeling Loss for the FY 2015-2016 and FY 2016-2017 and for non-refund of Wheeling Charges & Wheeling Loss paid to erroneously levied by the Distribution Licensee MSEDCL.

 

[187 of 2018]
 

  

  10:00

Petition of M/s. Trimurti Spinning Mills Private Limited under Section 142 & 149 of the Electricity Act, 2003 against MSEDCL for non-compliance of MERC Order Case No. 115 of 2017 dated 03 May, 2018.

 

[182 of 2018]
 

  

 

  10:00

Petition of Shri Haribhau Digambar Khapare under Section 142 & 149 of the Electricity Act, 2003 for non-compliance of MERC Order in Case No. 70 of 2005 dated 08.09.2006.

 

[180 of 2018]
 

  10:00

Petition of Shri Rahul Mohan Devmore under Section 142 & 149 of the Electricity Act, 2003 for non-compliance of MERC SoP Regulation, 2005.

 

[181 of 2018]
 

10:00

Petition of The Ruby Mills Limited Intervention application in Case No. 71 of 2009 MSEDCL's proposal for levy of Voltage surcharge on consumers who are supplied power at lower than prescribed voltage, as per SOP Regulations.

 

[61 of 2018]
 

2018
10:00

Petition of Sujan Industries Unit No.2 against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for Non-compliance of CGRF Kalyan Zone Order no. 1144/2015-16 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[188 to 190 of 2017, 01 to 26 of 2018 and 30 to 44 of 2018]
 

  10:00

Petition of Vidhata Metals Pvt. Ltd against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-Compliance of CGRF Kalyan Zone 4 Orders of consumer no.010519035310 under Section 142 read with 146 of the EA, 2003 for violating these Orders.

 

[182 of 2017, 54 to 58 of 2018, 66 of 2018, 80 to 82 of 2018 & 87 to 88 of 2018]
 

  10:00

Petition of Maharashtra State Electricity Distribution Co. Ltd. for seeking approval for deviation in standard bidding document for long term procurement of solar power under 'Mukhyamantri Sour Krishi Vahini Yojana' with 2 to 10 MW capacity projects connected to distribution network with total quantum of 1400 MW through competitive bidding.

 

[ 270 of 2018]
 

2018
10:00

Petition of Adani Power Maharashtra Limited Review of MERC Order dated 18.10.2017 in case No.38 of 2016 under Regulations 85 of MERC Conduct of Business Regulations, 2004 in relation to change in law relief under PPAs dated 08.09.2008, 31.10.2010, 09.08.2010 and 16.02.2013 executed between MSEDCL and APML.

 

[84 of 2018]
 

  

 

  10:00

Implementation of the ATE’s Judgment dated 10 February, 2015 in Appeal No. 70 of 2013 filed by Wardha power company Limited against MERC Case No 53 of 2012 Order dated 27.12.2012. (Petition of Maharashtra State Electricity Distribution Company Ltd. for approval of PPA for additional quantum between Indiabulls Realtech Ltd. (Nashik) and Adani Power Maharashtra Ltd. based on Competitive Bidding Process.)

 

[53 of 2012]
 

  

 

  10:00

Petition of RattanIndia Power Limited under Section 86 of the Electricity Act, 2003 seeking compensation for penalty imposed by SECL on account of non-procurement of minimum quantity of fuel by RattanIndia under the FSA, due to low despatch by MSEDCL in accordance with Clause 4.5 of Schedule 4 of the PPA between RattanIndia and MSEDCL.

 

[146 of 2018]
 

  

  10:00

Petition of RattanIndia Power Ltd. for Power Purchase Agreement between RPL and MSEDCL for 1200 MW and for issue of directions to MSLDC to accept and schedule the declared capacity of up to 258 MW for all 5 units of Amravati TPS.

 

[59 of 2018]
 

  

  10:00

Petition of Essar Steel India Limited (ESIL) against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) seeking exemption from Cross Subsidy Surcharge as Essar Steel India Limited is a captive user in accordance with Section 42 of the EA, 2003 read with Rule 3 of the Electricity Rules 2005 along with Regulations framed by the Commission from time to time.

 

[45 of 2018]
 

  

 

  10:00

Petition of Ordnance Factory Ambajhari Seeking Intervention and Direction of this Hon’ble Commission U/s. 86 (1) (e) of the Electricity Act, 2003 in matter of 5 MW Ground Mounted Grid Connected PV Solar Power Plant installed by M/s. Azure Power Uranus Pvt. Ltd. at Ordnance Factory Ambajhari, Nagpur, under 300 MW Defence Scheme of Government of India.

 

[211 of 2018]
 

  

 

  10:00

Petition of M/s. Indo Count Industries Limited under Section 142 & 146 of the Electricity Act 2003 for violating the Order of CGRF dated 07.02.18 read with order dated 25.01.18.

 

[212 of 2018]
 

  

  10:00

Petition of M/s. Pranavaditya Spinning Mills Limited under Section 142 & 146 of the Electricity Act 2003 for violating the Order of CGRF dated 07.02.18 read with order dated 25.01.18.

 

[213 of 2018]
 

  

  10:00

Petition of M/s. Marigold Pharmaceuticals Pvt. Limited under Section 142, 146 and 149 the Electricity Act, 2003 for non-compliance of Hon’ble CGRF, Baramati zone’s Order dated 14 May, 2018 for Case No. 03 of 2018 and non resolution matter related to the connection by MSEDCL.

 

[210 of 2018]
 

  

  10:00

Petition of Pravin Mormukut Brijwasi, as partner Rajyog Group Venture & Others for regarding Violation by MSEDCL of Supply Code Regulations and in the matter of the Order of Assessment dated 30/05/2018.

 

[202 of 2018]
 

  

 

  10:00

Petition of M/s Vinchurkar-Pawar Diagnostic Centre against MSEDCL for non-compliance of Judgement / Order dated 11.04.2017 passed by CGRF, Nashik Zone in Case No. 76/16- 17.

 

[107 of 2018]
 

  

  10:00

Petition of Shri Mangesh Madhukar Pandit against MSEDCL for Non Compliance of MERC Order in Case No. 44 of 2017 dated 16.02.2018.

 

[111 of 2018]
 

  

  10:00

Petition of Sagir Ahmed Munir Ahmed (Bhiwandi Electricity Users Welfare Association) against MSEDCL for non compliance of Order of the CGRF 11/2017 dated 11/07/2017 and Order of the Electricity Ombudsman 13/2018 dated 26/02/2018.

 

[162 of 2018]
 

  

  10:00

Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for review of order dated 27.02.2018 in Case No. 19 of 2017 passed by the Commission.

 

[123 of 2018]
 

  

2018
10:00

Petition of M/s. Clean Wind Power (Satara) Private Limited for release of the total amount due and payable to it by MSEDCL for supply of wind energy as per the provisions of the Wind Energy Purchase Agreement dated October 10, 2014.

 

[148 of 2018]
 

  

 

  10:00

Petition of M/s. Clean Wind Power (Satara) Private Limited for release of the total amount due and payable to it by MSEDCL for supply of wind energy as per the provisions of the Wind Energy Purchase Agreement dated March 21, 2017.

 

[149 of 2018]
 

  

 

  10:00

Petition of Zaveri & Co Zaveri & Co. Private Limited seeking Order / Directing the Respondents to pay LPS (Late Payment Surcharge) for a sum total of Rs 45,94,975/00 (Rs forty five lakh ninety four thousand nine hundred seventy five only)

 

[143 of 2018]
 

  

 

  10:00

Petition of Zaveri & Co Exports for seeking Order / Directing the Respondents to pay LPS (Late Payment Surcharge) for a Sum Total of Rs 12,18,004/00 (Rs Twelve Lakh Eighteen Thousand Four only)

 

[144 of 2018]
 

  

 

  10:00

Petition of Purshottam Lohia for seeking Order / Directing the Respondents to pay LPS (Late Payment Surcharge) for a sum total of Rs. 27,26,160/- (Rupees Twenty Seven Lakhs Twenty Six Thousand One Hundred Sixty Only).

 

[145 of 2018]
 

  

 

  10:00

Petition of Cosmo Films Limited under Section 86 (1) (k) of the Electricity Act, 2003 for clarification regarding the applicability of Power Factor Incentive to the Open Access power consumption by HT consumers.

 

[214 of 2018]
 

  

 

  10:00

Petition of Wali Mohammed S/o Abdul Aziz under Section 67 (4) of Electricity Act, 2003 R/W Rule 13 of The Maharashtra Electricity Works of Licensee Rules 2012, seeking proper compensation towards the erection of Transmission Line Tower in the Petitioner’s Land by MSETCL.

 

[215 of 2018]
 

  

  10:00

Petition of Essar Steel India Limited (ESIL) against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) seeking exemption from Cross Subsidy Surcharge as Essar Steel India Limited is a captive user in accordance with Section 42 of the EA, 2003 read with Rule 3 of the Electricity Rules 2005 along with Regulations framed by the Commission from time to time.

 

[45 of 2018]
 

  

  10:00

Petition of Maharashtra State Electricity Distribution Co. Ltd. seeking review of the Order No. 15 of 2017 dated 01.03.2018 in the matter of reduction in the technical minimum of generating units in Maharashtra as per Central Electricity Regulatory Commission norms.

 

[115 of 2018]
 

 

  10:00

Petition of Adani Power Maharashtra Limited Review of MERC Order dated 18.10.2017 in case No.38 of 2016 under Regulations 85 of MERC Conduct of Business Regulations, 2004 in relation to change in law relief under PPAs dated 08.09.2008, 31.10.2010, 09.08.2010 and 16.02.2013 executed between MSEDCL and APML.

 

[84 of 2018]
 

  

  10:00

Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) seeking review of the MERC'S Order dated 02.05.2018 (Case No. 111 of 2017) in the matter to regulate purchase and procurement process of Distribution Licensees, including the price at which electricity shall be procured from the Generating companies or from other sources through agreements for purchase of power for distribution and supply within the State.

 

[186 of 2018]
 

  

2018
10:00

Petition of Hemant Group & Others 3 under Section 86 (1) (e) and Section 86 (2) of the Electricity Act, 2003 read with the Clause 5.12 of the National Electricity Policy dated 12.02.2005 and Clause 6.4 of the Tariff Policy dated 06.01.2006 seeking clarification from the Honâ??ble Commission that Renewable Energy Sources also includes Solar Energy meaning thereby that the Renewable Energy Policy dated 14.10.2008 notified by the GoM is a comprehensive policy for all renewable energy including Solar Energy and benefits accruing thereof to projects commissioned under the said policy needs to be passed on to the project developers by the concerned distribution licensees.

 

[126 of 2018]
 

  

  10:00

Petition of Siddhayu Ayurvedic Research Foundation Private Limited review petition under regulation 85 of MERC (Conduct of Business) Regulations, 2004 read with Section 94 (1) (f) of the Electricity Act, 2003 and in the matter of review of part of Order dated 10.04.2018 in Case No. 83 of 2017 and M. A. No. 16 of 2017 passed by the Hon'ble Commission and in the matter of petition of Siddhayu Ayurvedic Research foundation Pvt. Ltd. regarding non-payment of dues by Global Energy Pvt. Ltd. under the EPA dated 20.09.2012.

 

[141 of 2018]
 

  

  10:00

Petition of Siddhayu Ayurvedic Research Foundation Private Limited Petition against Global Energy Private Limited for non-compliance of Order dated 10.04.2018 in Case No. 83 of 2017 and M.A No. 16 of 2017 passed by the Hon'ble Commission.

 

[142 of 2018]
 

  

  10:00

Implementation of the Appellate Tribunal for Electricity ( ATE)'s Judgment dated 07 August, 2018 in Appeal No. 77 of 2015 filed by Global Energy Private Ltd. (GEPL) challenging Commission's Order dated 19 December, 2014 in Case No. 148 of 2014, (Petition of M/s. Global Energy Limited for seeking issuance of appropriate directions upon the Respondent for levy of Tariff by arbitrarily subjecting the partial open access consumers to a different tariff category which is contrary to the provisions of the Electricity Act, 2003.)

 

[148 of 2014]
 

  

  10:00

Petition of The Indian Hotels Company Limited under Sections 86 (1)(a) and 86 (1)(k) read with section 62 of the Electricity Act, 2003, seeking declaratory reliefs in respect of refund of the Transport Division Loss Recovery Charge illegally collected by the Respondent during the period FY 2012-13 to FY 2015-16.

 

[190 of 2018]
 

  

  10:00

Petition of Maharashtra State Electricity Distribution Company Ltd. under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 requesting the Hon’ble Commission to review its order dated 04.05.2017 passed in Case No. 37 and 38 of 2017.

 

[248 of 2018]
 

  

  10:00

Petition of Mohite Industries Limited against Maharashtra State Electricity Distribution Company limited for non-compliance of Distribution Open Access Regulations, 2016 and to issue direction for releasing payments towards un utilised banked energy from 10 MW Small Hydro Power Project.

 

[110 of 2018]
 

  

  10:00

Petition of Hindustan Petroleum Corporation Limited under Section 86 (1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Hindustan Petroleum Corporation Limited and MSEDCL.

 

[223 of 2018]
 

  

 

  10:00

Petition of Bhadreshwar Vidyut Private Limited (formerly known as OPGS Power Gujarat Private Limited) in accordance with the Order passed by this Hon’ble Commission in Case No. 23 of 2017 dated 17.01.2018 against unlawful action of MSEDCL in issuing the letter dated 29.05.2018 thereby making the captive users of the Petitioner liable to pay CSS and Additional Surcharge for the power procured for captive use in FY 2017-18.

 

[175 of 2018]
 

  

2018
10:00

Petition of Essam Gas Pvt. Ltd seeking clarifications as to the applicability of its Tariff Order dated 03.11.2016 in Case No. 48 of 2016 on the issue of exceeding Contract Demand during night hours and directing the Respondent MSEDCL to extend full benefits of Load Factor Incentives to the Petitioner.

 

[60 of 2018]
 

  

 

  10:00

Review Petition of Maharashtra State Electricity Distribution Co. Ltd for requesting the Hon'ble Commission to review its order dated 12.07.2018 passed in Case No. 84 of 2015. (Petition of Jawahar Shetkari Sahakari Sakhar Karkhana Ltd. regarding compliance of direction given by the Commission in the Order dated 11 November, 2014 in Case No. 127 of 2014 and Discussion Paper regarding the treatment of similar cases post expiry of Energy Purchase Agreement)

 

[264 of 2018]
 

  

  10:00

Petition of Mohite Industries Limited against Maharashtra State Electricity Distribution Company limited for non-compliance of Distribution Open Access Regulations, 2016 and to issue direction for releasing payments towards un utilised banked energy from 10 MW Small Hydro Power Project.

 

[110 of 2018]
 

  

 

  10:00

Review Petition of M/s Topworth Urja and Metals Limited under Sections 94 of the Electricity Act, 2003 Read With Regulation 85,92,93,94 and 95 of the MERC (Conduct of Business) Regulations, 2004 Review of the Order dated 4th May, 2018 passed in Case No.5 of 2016.

 

[174 of 2018]
 

  

  10:00

Petition of Maharashtra State Electricity Distribution Co. Ltd.(MSEDCL) under Section 86 (1) (f), (k) and other applicable provisions of the EA, 2003 and in connection with the dispute and differences arising under the standby power agreements dated 13.06.2014, 29.08.2015, 30.06.16 executed between Global Energy Pvt. Ltd. and MSEDCL.

 

[78 of 2018]
 

  

  10:00

Petition of M/s. Global Energy Limited for seeking issuance of appropriate directions upon the Tata Power Co. Ltd. for levy of Tariff by arbitrarily subjecting the partial Open Access consumers to a different tariff category which is contrary to the provisions of the Electricity Act, 2003.

 

[148 of 2014]
 

  

For Filing of Amendment Petition

2018
10:00

Petition of Mahalaxmi Vidyut Pvt. Limited for Refund of Evacuation charges and Maintenance charges and Breach of P.P.A. dated 18-12-2010, executed between petitioner and Respondent.

 

[171 of 2018]
 

  

 

  10:00

Petition of Sai Wardha Power Generation Limited for seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18.

 

[170 of 2018]
 

  

 

  10:00

Petition of Bhadreshwar Vidyut Private Limited (formerly known as OPGS Power Gujarat Private Limited) in accordance with the Order passed by this Hon’ble Commission in Case No. 23 of 2017 dated 17.01.2018 against unlawful action of MSEDCL in issuing the letter dated 29.05.2018 thereby making the captive users of the Petitioner liable to pay CSS and Additional Surcharge for the power procured for captive use in FY 2017-18.

 

[175 of 2018]
 

  

 

  10:00

Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.

 

[175 of 2017]
 

  

 

  10:00

Petition of Sai Wardha Power Generation Limited for directions to the Respondent in regard to the terms of Open Access granted by the Respondent for the period from 01.04.2018.

 

[116 of 2018]
 

  

 

  10:00

Petition of Hindustan Petroleum Corporation Limited under Section 86 (1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Hindustan Petroleum Corporation Limited and MSEDCL.

 

[223 of 2018]
 

  

 

2018
10:00

Petition of Spentex Industries Limited to amend the provisions of Load Factor Incentive under the Tariff Order.

 

[158 of 2018]
 

  

 

  10:00

Petition of Petition of Spentex Industries Ltd. for Arbitrary Levy of Wheeling Charges & Applicable Loss for the Financial Year 2015-2016 and Financial Year 2016-2017 in contradistinction to provisions of Electricity Act, 2003 and Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations 2014 and Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations 2015.

 

[159 of 2018]
 

  

 

  10:00

Petition of Laxmi Organic Industries Limited under Section 142 of Electricity Act, 2003 for non compliance of order dated 02.04.2018 passed in Case No.97 of 2016.

 

[168 of 2018]
 

  

 

  10:00

Review Petition of M/s Topworth Urja and Metals Limited under Sections 94 of the Electricity Act, 2003 Read With Regulation 85,92,93,94 and 95 of the MERC (Conduct of Business) Regulations, 2004 Review of the Order dated 4th May, 2018 passed in Case No.5 of 2016.

 

[174 of 2018]
 

  

 

  10:00

Petition of Spentex Industries Limited for Arbitrary Levy of Wheeling Charges & applicable Wheeling Loss for the FY 2015-2016 and FY 2016-2017 and for non-refund of Wheeling Charges & Wheeling Loss paid to erroneously levied by the Distribution Licensee MSEDCL.

 

[187 of 2018]
 

  

 

  10:00

Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for review of order dated 27.02.2018 in Case No. 19 of 2017 passed by the Commission.

 

[123 of 2018]
 

  

 

2018
10:00

Petition of Reliance Infrastructure Limited (Distribution) under Regulation 7 and 16 of MERC (Renewable Purchase Obligations, its Compliance and Implementation of REC Framework) Regulations 2016, in respect of cumulative fulfillment of Renewable Purchase Obligation (RPO) for FY 2016-17, FY 2017-18 and FY 2018-19.

 

[94 of 2018]
 

  

 

  10:00

Petition of M/s. Mindspace Business Parks Private Limited (MBPPL) for approval of the Commission to allow cumulative fulfillment of its Renewable Purchase Obligation targets for Solar Power for FY 2017-18 and FY 2018-19.

 

[109 of 2018]
 

  

 

  10:00

Petition of The Tata Power Company Limited for Approval for fulfilling Solar RPO Targets of FY 2017-18.

 

[114 of 2018]
 

  

 

  10:00

Petition of M/s. Gigaplex Estate Private Limited (GEPL) for approval of the Hon’ble Commission to allow cumulative fulfilment of its Renewable Purchase Obligation Targets for Solar Power for FY 2017-18 and FY 2018-19.

 

[108 of 2018]
 

  

 

2018
10:00

Petition of Shri Rahul Mohan Devmore under Section 142 & 149 of the Electricity Act, 2003 for non-compliance of MERC SoP Regulation, 2005.

 

[181 of 2018]
 

  

 

10:00

Petition of The Ruby Mills Limited Intervention application in Case No. 71 of 2009 MSEDCL's proposal for levy of Voltage surcharge on consumers who are supplied power at lower than prescribed voltage, as per SOP Regulations.

 

[61 of 2018]
 

  

 

  10:00

Petition of Shri Haribhau Digambar Khapare under Section 142 & 149 of the Electricity Act, 2003 for non-compliance of MERC Order in Case No. 70 of 2005 dated 08.09.2006.

 

[180 of 2018]
 

  

 

  10:00

Petition of M/s. Trimurti Spinning Mills Private Limited under Section 142 & 149 of the Electricity Act, 2003 against MSEDCL for non-compliance of MERC Order Case No. 115 of 2017 dated 03 May, 2018.

 

[182 of 2018]
 

  

 

  10:00

Petition of Essam Gas Pvt. Ltd seeking clarifications as to the applicability of its Tariff Order dated 03.11.2016 in Case No. 48 of 2016 on the issue of exceeding Contract Demand during night hours and directing the Respondent MSEDCL to extend full benefits of Load Factor Incentives to the Petitioner.

 

[60 of 2018]
 

  

 

  10:00

Review Petition of Maharashtra State Electricity Distribution Co. Ltd for requesting the Hon'ble Commission to review its order dated 12.07.2018 passed in Case No. 84 of 2015. (Petition of Jawahar Shetkari Sahakari Sakhar Karkhana Ltd. regarding compliance of direction given by the Commission in the Order dated 11 November, 2014 in Case No. 127 of 2014 and Discussion Paper regarding the treatment of similar cases post expiry of Energy Purchase Agreement)

 

[264 of 2018]
 

  

 

2018
10:00

Petition of M/s Vinchurkar-Pawar Diagnostic Centre against MSEDCL for non-compliance of Judgement / Order dated 11.04.2017 passed by CGRF, Nashik Zone in Case No. 76/16- 17.

 

[107 of 2018]
 

  

 

  10:00

Petition of Shri Mangesh Madhukar Pandit against MSEDCL for Non Compliance of MERC Order in Case No. 44 of 2017 dated 16.02.2018.

 

[111 of 2018]
 

  

 

  10:00

Petition of Sagir Ahmed Munir Ahmed (Bhiwandi Electricity Users Welfare Association) against MSEDCL for non compliance of Order of the CGRF 11/2017 dated 11/07/2017 and Order of the Electricity Ombudsman 13/2018 dated 26/02/2018.

 

[162 of 2018]
 

  

 

  10:00

Petition of Mohite Industries Limited against Maharashtra State Electricity Distribution Company limited for non-compliance of Distribution Open Access Regulations, 2016 and to issue direction for releasing payments towards un utilised banked energy from 10 MW Small Hydro Power Project.

 

[110 of 2018]
 

  

 

2018
10:00

Petition of Sai Wardha Power Generation Limited for seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18.

 

[170 of 2018]
 

  

 

  10:00

Petition of Bhadreshwar Vidyut Private Limited (formerly known as OPGS Power Gujarat Private Limited) in accordance with the Order passed by this Hon’ble Commission in Case No. 23 of 2017 dated 17.01.2018 against unlawful action of MSEDCL in issuing the letter dated 29.05.2018 thereby making the captive users of the Petitioner liable to pay CSS and Additional Surcharge for the power procured for captive use in FY 2017-18.

 

[175 of 2018]
 

  

 

  10:00

Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.

 

[175 of 2017]
 

  

 

  10:00

Petition of Sai Wardha Power Generation Limited for directions to the Respondent in regard to the terms of Open Access granted by the Respondent for the period from 01.04.2018.

 

[116 of 2018]
 

  

 

  10:00

Petition of Shri Laxman Mahadev Galave against MSEDCL for non compliance of Electricity Ombudsman Order dated 7.3.2018 passed in Representation No. 23 of 2018 and CGRF Kolhapur Order dated 16.10.2017.ion vide Trading License bearing No. 01 of 2018 dated 27.04.2018.

 

[216 of 2018]
 

  

 

  10:00

Petition of Hindustan Petroleum Corporation Limited under Section 86 (1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Hindustan Petroleum Corporation Limited and MSEDCL.

 

[223 of 2018]
 

  

 

2018
10:00

Petition of M/s. Marigold Pharmaceuticals Pvt. Limited under Section 142, 146 and 149 the Electricity Act, 2003 for non-compliance of Hon’ble CGRF, Baramati zone’s Order dated 14 May, 2018 for Case No. 03 of 2018 and non resolution matter related to the connection by MSEDCL.

 

[210 of 2018]
 

  

 

  10:00

Petition of Rattan India Power Limited under Section 86 of the Electricity Act, 2003 read with Article 10 ("Change in Law") of PPAs dated 22.04.2010 and 05.06.2010 executed between Maharashtra State Electricity Distribution Company Limited (MSEDCL) and Rattan India Power Limited (RPL) for appropriate adjustment in tariff due to "Change in Law" which substantially affects cost and revenue of the project.

 

[227 of 2018]
 

  

 

  10:00

Petition of M/s. Clean Wind Power (Satara) Private Limited for release of the total amount due and payable to it by MSEDCL for supply of wind energy as per the provisions of the Wind Energy Purchase Agreement dated October 10, 2014.

 

[148 of 2018]
 

  

 

  10:00

Petition of M/s. Clean Wind Power (Satara) Private Limited for release of the total amount due and payable to it by MSEDCL for supply of wind energy as per the provisions of the Wind Energy Purchase Agreement dated March 21, 2017

 

[149 of 2018]
 

  

 

  10:00

Petition of M/s. Bothe Windfarm Development Private Limited seeking remittance and release of the due and payable monthly invoices raised upon MSEDCL by M/s. Bothe Windfarm Development Private Limited towards power supplied till date under various Energy Power Purchase Agreements.

 

[185 of 2018]
 

  

 

  10:00

Petition of M/s. Bhilwara Green Energy Limited under section 86 (1) (f) of the Electricity Act, 2003 field on behalf of M/s. Bhilwara Green Energy Limited for release of the total amount due and payable to it by MSEDCL for supply of wind energy as per the provision of the various Wind Energy Purchase Agreements entered into between the parties.

 

[222 of 2018]
 

  

 

  10:00

Petition of M/s Bengal Cardboard Industries & Printers Pvt. Ltd. under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between M/s Bengal Cardboard Industries & Printers Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited

 

[229 of 2018]
 

  

 

  10:00

Petition of M/s Vostok (Fareast) Securities Pvt. Ltd. under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between M/s Vostok (Fareast) Securities Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited

 

[230 of 2018]
 

  

 

  10:00

Petition of M/s Silverline Investment Company Pvt. Ltd. under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between M/s Silverline Investment Company Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited

 

[231 of 2018]
 

  

 

  10:00

Petition of Mrs. Aishwarya Rai Bachchan under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Mrs. Aishwarya Rai Bachchan and Maharashtra State Electricity Distribution Company Limited.

 

[256 of 2018]
 

  

 

  10:00

Petition of Spentex Industries Ltd. against MSEDCL’s action of arbitrary levy of wheeling charges & losses for FY 2015-2016 and FY 2016-2017 to its plant located at Butibori, Nagpur.

 

[159 of 2018]
 

  

 

  10:00

Petition of Spentex Industries Ltd. against MSEDCL’s action of arbitrary levy of wheeling charges & losses for FY 2015-2016 and FY 2016-2017 to its plant located at Baramati, Pune

 

[187 of 2018]
 

  

 

  10:00

Petition of The Indian Hotels Company Limited under Sections 86 (1)(a) and 86 (1)(k) read with section 62 of the Electricity Act, 2003, seeking declaratory reliefs in respect of refund of the Transport Division Loss Recovery Charge illegally collected by the Respondent during the period FY 2012-13 to FY 2015-16.

 

[190 of 2018]
 

  

 

2018
10:00

Petition of Maharashtra Krushak Hitwardhak Sanghatana for directions, the respondent company be directed not to disconnect the electricity supply of the agriculturists on the basis of non- payment of the electricity bills as such the State Government has already paid the said bills to respondent company. The Petition is filed in view of the directions given by the Hon'ble High Court.

 

[250 of 2018]
 

  

 

  10:00

Petition of Rattan India Power Limited under Section 86 of the Electricity Act, 2003 read with Article 10 ("Change in Law") of PPAs dated 22.04.2010 and 05.06.2010 executed between Maharashtra State Electricity Distribution Company Limited (MSEDCL) and Rattan India Power Limited (RPL) for appropriate adjustment in tariff due to "Change in Law" which substantially affects cost and revenue of the project.

 

[227 of 2018]
 

  

 

  10:00

Petition of Bharat Electronics Limited under Regulation 15 R/W Regulation 85 of the MERC (Conduct of Business) Regulations, 2004 for Review of Order dated 15.06.2018 in case No. 160/2017 (Allocation of 3 MW Solar Power Project to Ammunition Factory Khadki, Pune, Under 300MW Defence Scheme of Govt. if India.)

 

[217 of 2018]
 

  

 

  10:00

Petition of Essam Gas Pvt. Ltd seeking clarifications as to the applicability of its Tariff Order dated 03.11.2016 in Case No. 48 of 2016 on the issue of exceeding Contract Demand during night hours and directing the Respondent MSEDCL to extend full benefits of Load Factor Incentives to the Petitioner.

 

[60 of 2018]
 

  

 

  10:00

Petition of Brihanmumbai Electric Supply and Transport Undertaking (BEST) under Section 86 (1) (b) of Electricity Act, 2003 to regulate electricity purchase and procurement process of distribution licensees including the price at which electricity shall be procured from the generating companies or licensees or from other sources through agreements for purchase of power for distribution and supply within the State.

 

[249 of 2018]
 

  

 

  10:00

Petition of M/s Topworth Urja and Metals Ltd under Sections 94 of the Electricity Act, 2003 Read With Regulation 85,92,93,94 and 95 of the MERC (Conduct of Business) Regulations, 2004 Review of the Order dated 4 May, 2018 passed in Case No.5 of 2016.

 

[174 of 2018]
 

  

 

2018
10:00

Petition of Jewelex India Private Limited under Section 86(1)(f) of the Electricity Act, 2003 seeking directions from the Hon’ble Commission to MSEDCL for payment of outstanding bills immediately alongwith delayed payment charges and interest accrued thereupon and other remedies and petition requesting the Hon’ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of article 12 of the Energy Purchase Agreement dated 24.04.2006 entered between the Petitioner and the Respondent .

 

[232 of 2018]
 

  

 

  10:00

Petition of M/s. Markdata Green Energy Private Limited under Section 86(1)(E)(K) of the Electricity Act, 2003 read with 93 and 94 of MERC(Conduct of Business) Regulations, 2004 praying the Commission to to exercise its inherent powers and requesting the Commission to issue necessary directions to MSEDCL to honor the terms and conditions of Article11.04 of the Energy Purchase Agreement dated 24.6.2014 & amended EPA dated 14.1.2016 entered between the Applicant and the Respondent.

 

[235 of 2018]
 

  

 

  10:00

Petition of Neha Sharma against the MSEDCL seeking the kind indulgence of this Hon'ble Commission in directing MSEDCL to comply with Article 10.05 of the EPA dated 21.03.2017 and pay the outstanding amounts to the Applicants alongwith Late Payment Surcharge (“LPS”) and interest accrued thereupon.

 

[236 of 2018]
 

  

 

  10:00

Petition of Baidyanath Power Private Limited against the MSEDCL seeking the kind indulgence of this Hon’ble Commission in directing MSEDCL to comply with Article 11.04 and 12.02 of the Energy Purchase Agreement entered between the Applicant and the Respondent. (Late Payment Surcharge)

 

[237 of 2018]
 

  

 

  10:00

Petition of Shah Promoters & Developers under Section 86(1)(f), 86(1)(k), 142 and 146 of the Electricity Act, 2003 pertaining to adjudication of disputes between Shah Promoters & Developers and Maharashtra State Electricity Distribution Company Limited.

 

[245 of 2018]
 

  

 

2018
10:00

Petition of Bharat Electronics Limited under Regulation 15 R/W Regulation 85 of the MERC (Conduct of Business) Regulations, 2004 for Review of Order dated 15.06.2018 in case No. 160/2017 (Allocation of 3 MW Solar Power Project to Ammunition Factory Khadki, Pune, Under 300MW Defence Scheme of Govt. if India.)

 

[217 of 2018]
 

  

 

  10:00

Petition of Shyam Indus Power Solutions Pvt. Limited under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Petitioner and Global Energy Pvt Ltd.

 

[274 of 2018]
 

  

 

  10:00

Suo moto proceeding in the matter of taking on record the Deemed Distribution Licensee status of the Indian Railways and issuing Specific Conditions of Distribution Licence applicable to it.

 

[149 of 2017]
 

  

 

  10:00

Petition of Essar Steel India Limited (ESIL) against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) seeking exemption from Cross Subsidy Surcharge as Essar Steel India Limited is a captive user in accordance with Section 42 of the EA, 2003 read with Rule 3 of the Electricity Rules 2005 along with Regulations framed by the Commission from time to time.

 

[45 of 2018]
 

  

 

  10:00

Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking direction of the Commission to Global Energy Private Limited (GEPL) to pay outstanding amount of the Standby Arrangement under the Standby Power Agreements dated 13 June, 2014, 29 August, 2015 and 30 June, 2016.

 

[78 of 2018]
 

  

 

2018
10:00

Petition of Pravin Mormukut Brijwasi, as partner Rajyog Group Venture & Others for regarding Violation by MSEDCL of Supply Code Regulations and in the matter of the Order of Assessment dated 30/05/2018.

 

[202 of 2018]
 

23/10/2018 at 10:00 hrs

2018
10:00

Petition of M/s. Clean Wind Power (Satara) Private Limited for release of the total amount due and payable to it by MSEDCL for supply of wind energy as per the provisions of the Wind Energy Purchase Agreement dated October 10, 2014.

 

[148 of 2018]
 

  

 

  10:00

Petition of M/s. Clean Wind Power (Satara) Private Limited for release of the total amount due and payable to it by MSEDCL for supply of wind energy as per the provisions of the Wind Energy Purchase Agreement dated March 21, 2017

 

[149 of 2018]
 

  

 

  10:00

Petition of M/s. Bothe Windfarm Development Private Limited seeking remittance and release of the due and payable monthly invoices raised upon MSEDCL by M/s. Bothe Windfarm Development Private Limited towards power supplied till date under various Energy Power Purchase Agreements.

 

[185 of 2018]
 

  

 

  10:00

Petition of M/s. Bhilwara Green Energy Limited under section 86 (1) (f) of the Electricity Act, 2003 field on behalf of M/s. Bhilwara Green Energy Limited for release of the total amount due and payable to it by MSEDCL for supply of wind energy as per the provision of the various Wind Energy Purchase Agreements entered into between the parties.

 

[222 of 2018]
 

  

 

2018
10:00

Inviting Suggestions/ Objections on VIPL-Generation's Petition for Revised Truing up of ARR for FY 2014-15, Truing up of ARR for FY 2015-16 and FY 2016-17, Provisional Truing up of ARR for FY 2017-18, Revised ARR and Tariff for FY 2018-19 and FY 2019-20

 

Public Notice English

Public Notice Marathi

Executive Summary English

Executive Summary Marathi

 

Public Hearing Venue: 13th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai 400 005.

 

[ 199 of 2017]
 

  

 

  10:00

Petition of Pravin Mormukut Brijwasi, as partner Rajyog Group Venture & Others for regarding Violation by MSEDCL of Supply Code Regulations and in the matter of the Order of Assessment dated 30/05/2018.

 

[202 of 2018]
 

 

 

  10:00

Petition of Laxmipati Balaji Supply Chain Management Limited for taking on record the deemed Distribution Licensee status of the Petitioner, Laxmipati Balaji Supply Chain Management Limited ("LBSCML"/Co-Developer") for the Sector Specific SEZ and Information Technology (IT) SEZ being developed by Arshiya International Limited ("AIL"/”Developer") at Village Sai, Taluka Panvel, Dist. Raigad, Maharashtra, and for issuing the Specific Conditions of Distribution License, as may be made applicable to the Petitioner.

 

[275 of 2018]
 

 

 

2018
10:00

Petition of Gold Corporation for grant of Intra-State Trading Licence, to undertake trading of electricity, for 50 MU for the first year and gradually increase to 100 MU over a period of next five years, in the State of Maharashtra.

 

[174 of 2017]
 

30/10/2018 at 10:00 hrs

  10:00

Petition of Maharashtra State Power Generation Company Limited compliance to directives in the Order in Case No. 59 of 2017 dated 14.12.17 for approval of Capital Cost and Tariff of Koradi Generating Units 8, 9 & 10, Chandrapur Units 8 & 9 and Parli Unit 8.

 

[172 of 2018]
 

31/10/2018 at 10:00 hrs

2018
10:00

Petition of Jewelex India Private Limited under Section 86(1)(f) of the Electricity Act, 2003 seeking directions from the Hon’ble Commission to MSEDCL for payment of outstanding bills immediately alongwith delayed payment charges and interest accrued thereupon and other remedies and petition requesting the Hon’ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of article 12 of the Energy Purchase Agreement dated 24.04.2006 entered between the Petitioner and the Respondent .

 

[232 of 2018]
 

  

 

  10:00

Petition of M/s. Markdata Green Energy Private Limited under Section 86(1)(E)(K) of the Electricity Act, 2003 read with 93 and 94 of MERC(Conduct of Business) Regulations, 2004 praying the Commission to to exercise its inherent powers and requesting the Commission to issue necessary directions to MSEDCL to honor the terms and conditions of Article11.04 of the Energy Purchase Agreement dated 24.6.2014 & amended EPA dated 14.1.2016 entered between the Applicant and the Respondent.

 

[235 of 2018]
 

  

 

  10:00

Petition of Neha Sharma against the MSEDCL seeking the kind indulgence of this Hon'ble Commission in directing MSEDCL to comply with Article 10.05 of the EPA dated 21.03.2017 and pay the outstanding amounts to the Applicants alongwith Late Payment Surcharge (“LPS”) and interest accrued thereupon.

 

[236 of 2018]
 

  

 

  10:00

Petition of Baidyanath Power Private Limited against the MSEDCL seeking the kind indulgence of this Hon’ble Commission in directing MSEDCL to comply with Article 11.04 and 12.02 of the Energy Purchase Agreement entered between the Applicant and the Respondent. (Late Payment Surcharge)

 

[237 of 2018]
 

  

 

  10:00

Petition of Shah Promoters & Developers under Section 86(1)(f), 86(1)(k), 142 and 146 of the Electricity Act, 2003 pertaining to adjudication of disputes between Shah Promoters & Developers and Maharashtra State Electricity Distribution Company Limited.

 

[245 of 2018]
 

  

 

  10:00

Petition of Sai Wardha Power Generation Limited for seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18.

 

[170 of 2018]
 

  

 

  10:00

Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.

 

[175 of 2017]
 

  

 

  10:00

Implementation of the ATE’s Judgment dated 10 February, 2015 in Appeal No. 70 of 2013 filed by Wardha power company Limited against MERC Case No 53 of 2012 Order dated 27.12.2012. (Petition of Maharashtra State Electricity Distribution Company Ltd. for approval of PPA for additional quantum between Indiabulls Realtech Ltd. (Nashik) and Adani Power Maharashtra Ltd. based on Competitive Bidding Process.)

 

[53 of 2012]
 

  

 

  10:00

Petition of Gold Corporation for grant of Intra-State Trading Licence, to undertake trading of electricity, for 50 MU for the first year and gradually increase to 100 MU over a period of next five years, in the State of Maharashtra.

 

[174 of 2017]
 

 

 

  10:00

Petition of Sai Wardha Power Generation Limited for directions to the Respondent in regard to the terms of Open Access granted by the Respondent for the period from 01.04.2018.

 

[116 of 2018]
 

  

 

  10:00

Implementation of the Appellate Tribunal for Electricity ( ATE)'s Judgment dated 07 August, 2018 in Appeal No. 77 of 2015 filed by Global Energy Private Ltd. (GEPL) challenging Commission's Order dated 19 December, 2014 in Case No. 148 of 2014, (Petition of M/s. Global Energy Limited for seeking issuance of appropriate directions upon the Respondent for levy of Tariff by arbitrarily subjecting the partial open access consumers to a different tariff category which is contrary to the provisions of the Electricity Act, 2003.)

 

[148 of 2014]
 

  

2018
10:00

Petition of Jawahar Shetkari Sahakari Sakhar Karkhana Ltd., for clarification of Order dated 12th July, 2018 passed by Hon'ble Commission in MERC case No. 84 of 2015.

 

[225 of 2018]
 

  

 

  10:00

Petition of M/s Bengal Cardboard Industries & Printers Pvt. Ltd. under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between M/s Bengal Cardboard Industries & Printers Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited

 

[229 of 2018]
 

  

 

  10:00

Petition of M/s Vostok (Fareast) Securities Pvt. Ltd. under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between M/s Vostok (Fareast) Securities Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited

 

[230 of 2018]
 

  

 

  10:00

Petition of M/s Silverline Investment Company Pvt. Ltd. under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between M/s Silverline Investment Company Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited

 

[231 of 2018]
 

  

 

  10:00

Petition of Mrs. Aishwarya Rai Bachchan under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Mrs. Aishwarya Rai Bachchan and Maharashtra State Electricity Distribution Company Limited.

 

[256 of 2018]
 

  

 

  10:00

Petition of Maharashtra State Power Generation Company Limited compliance to directives in the Order in Case No. 59 of 2017 dated 14.12.17 for approval of Capital Cost and Tariff of Koradi Generating Units 8, 9 & 10, Chandrapur Units 8 & 9 and Parli Unit 8.

 

[172 of 2018]
 

 

       

 

Home ABOUT US PHOTO GALLERY ORDERS RULES AND REGULATIONS PRESS RELEASE COMPLAINTS OTHER LINKS CONTACT US

IMPORTANT: Maharashtra Electricity Regulatory Commission to ensure the accuracy of information furnished in this website, MERC does not accept any responsibility or liability for any damage or loss to any person for the result of any action taken on the basis of these information. However, MERC shall be obliged if errors / omissions are brought to its notice for carrying out corrections in the next update.

DESIGNED, DEVELOPED & MAINTAINED BY:
Maharashtra Electricity Regulatory Commission
Best View at 800 * 600 resolution and IE 4 & Above
© Copyright MERC 2002 © Copyright MERC 2002