Petition of Dhariwal Industries Limited & Anr under Section 86 (1) (d) and Section 86 (1) (k) seeking direction to Global Energy Private Limited (Trading Licensee) to honor the terms of the EPA entered between the Petitioners and Respondent and to release the admitted outstanding payments immediately alongwith interest.

 

[160 of 2018]
 

16/07/2018 at 10:00 hrs

  10:00

Petition of Asian Hotel (West) Limited under Section 9 and 42 (2) of the Electricity Act, 2003 for adjudication of dispute arisen between the Petitioner and the Respondent on the issue of levy of Regulatory Asset Charges ("RAC") on the Petitioners captive consumption availed through open access and in the matter of Petition under Regulation 32 and 37 of the MERC (Distribution Open Access) Regulations, 2016 and in the matter of Order dated 21.03.2018, passed by this Hon'ble Commission in Case No. 45 of 2017 (M/s. Hindustan Petroleum Corporation Limited Versus Tata Power Company Limited (Distribution).

 

[166 of 2018]
 

  

  10:00

Review Petition of Maharashtra State Power Generation Company Limited (MSPGCL) under Section 94 of the Electricity Act, 2003 and Regulation 85 of MERC (Conduct of Business) Regulations, 2004 against order dated 14.12.2017 in Case No. 59 of 2017 on a Petition filed by MSPGCL seeking approval of Capital Cost and Tariff of Koradi generating Units 8, 9 & 10 Chandrapur Units 8 & 9 and Parli Unit 8.

 

[77 of 2018]
 

  

2018
10:00

Petition of Essam Gas Pvt. Ltd seeking clarifications as to the applicability of its Tariff Order dated 03.11.2016 in Case No. 48 of 2016 on the issue of exceeding Contract Demand during night hours and directing the Respondent MSEDCL to extend full benefits of Load Factor Incentives to the Petitioner.

 

[60 of 2018]
 

16/07/2018 at 10:00 hrs

  10:00

Petition of The Ruby Mills Limited Intervention application in Case No. 71 of 2009 MSEDCL's proposal for levy of Voltage surcharge on consumers who are supplied power at lower than prescribed voltage, as per SOP Regulations.

 

[61 of 2018]
 

  

  10:00

Petition of M/s. Shree Shyam Agro Processors regarding non-compliance of the Consumer Grievance Redressal Forum Akola's Order dated 13 June, 2017 in Case No. 21 of 2017 by Maharashtra State Electricity Distribution Co. Ltd.

 

[95 of 2018]
 

  10:00

Petition of M/s. Shivshakti Stone Crusher Borgaon regarding non-compliance of the Consumer Grievance Redressal Forum Akola's Order dated 14 July, 2017 in Case No. 28 of 2017 by Maharashtra State Electricity Distribution Co. Ltd.

 

[96 of 2018]
 

  10:00

Petition of Dr. Hiralal Ganpatrao Nimbalkar against MSETCL for non compliance and for breach of Order and contempt of lawful authority and proper implementation of the Order. (Case No. 140 of 2016, Order dated 01.03.2017 and Case No.84 of 2017 Order dated 26.9.2017).

 

[100 of 2018]
 

  

  10:00

Petition of Central Railway under Section 62 and 86 (1)(b) (e) of the EA, 2003 seeking approval for erection of Solar Power equal to transformer capacity on rooftop/ground mounted proposed to be set up in the premises of existing Central Railway's substations to mitigate its RPO target given by the Commission.

 

[105 of 2018]
 

  

  10:00

Petition of Western Railway, Mumbai Central Division under Section 86 (1) (e) of the Electricity Act, 2003 read with Regulation 13 of the MERC (Net Metering for Roof-top Solar Photo Voltaic Systems) Regulations, 2015.

 

[112 of 2018]
 

  

2018
10:00

Petition of Shri Haribahu D. Khapare against MSEDCL under Section 142 & 149 of the Electricity Act, 2003 for non compliance of the Commission's Order passed in Case No 70 of 2005 Order dated 08.09.2006, Case No. 56 of 2007 dated 16.02.2008, Case No. 148 of 2011 dated Case No 05.01.2012, and Case No 36 of 2012 dated 23.11.2012.

 

[92 of 2018]
 

  

  10:00

Petition of Shri Babaso Laxman Babaso Laxman Joundal against MSEDCL for non Compliance of Ombudsman Mumbai Order No.45/2017 dt. 30.06.2017.

 

[93 of 2018]
 

  

  10:00

Petition of Shri. Balaso Maruti Mote under Section 94 (1) (f) of the Electricity Act, 2003 regarding non-compliance of MERC Order in Case No. 143 of 2017 dated 14.03.2018.

 

[140 of 2018]
 

  

  10:00

Petition of Shri. Chandrashekhar Ummanna Andavgol regarding non-compliance of Consumer Grievance Redressal Forum, Kolhapur's Order dated 6 June, 2017 in Case No. 1 to 3 of 2017-18 by Maharashtra State Electricity Distribution Co. Ltd.

 

[49 of 2018]
 

  

  10:00

Petition of Shri. Shivaji Kondiba Hatkar regarding non-compliance of Consumer Grievance Redressal Forum, Kolhapur's Order dated 22 November, 2017 in Case No. 38 of 2017-18 by Maharashtra State Electricity Distribution Co. Ltd.

 

[51 of 2018]
 

  

  10:00

Petition of Shri. Sanjay Raghu Mote regarding non-compliance of Consumer Grievance Redressal Forum, Kolhapur's Order dated 8 December, 2017 in Case No. 39 of 2017-18 and MERC Order dated 1 June, 2006 in Case No. 43 of 2005 by Maharashtra State Electricity Distribution Co. Ltd.

 

[89 of 2018]
 

  

  10:00

Petition of Shri. Hussian Aappaso Mulla regarding non-compliance of the Electricity Ombudsman Mumbai's Order dated 6 October, 2017 in Representation No. 90/2017 and MERC Order dated 1 June, 2006, in Case No. 43 of 2005 by Maharashtra State Electricity Distribution Co. Ltd.

 

[50 of 2018]
 

  

  10:00

Petition of Shri. Jayendra Ramu Mangaonkar regarding non-compliance of the Electricity Ombudsman Mumbai's Order dated 6 October, 2017 in Representation No. 91/2017 by Maharashtra State Electricity Distribution Co. Ltd.

 

[52 of 2018]
 

  

  10:00

Petition of Shri. Bhauso Nivruti Sawant regarding non-compliance of CGRF, Kolhapur Zone's Order dated 12 December, 2017 and MERC Order dated 1 June, 2006 in Case No. 43 of 2005 by Maharashtra State Electricity Distribution Co. Ltd.

 

[90 of 2018]
 

  

  10:00

Petition of Shri. Dattatray Govind Mali regarding non-compliance of CGRF, Kolhapur Zone's Order dated 12 December, 2017 and MERC Order dated 1 June, 2006 in Case No. 43 of 2005 by Maharashtra State Electricity Distribution Co. Ltd.

 

[91 of 2018]
 

  

2018
10:00

Suo moto proceeding in the matter of taking on record the Deemed Distribution
Licensee status of the Indian Railways and issuing Specific Conditions of Distribution Licence applicable to it.

 

[149 of 2017]
 

Date will be intimated shortly

  10:00

Petition of Essar Steel India Limited (ESIL) against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) seeking exemption from Cross Subsidy Surcharge as Essar Steel India Limited is a captive user in accordance with Section 42 of the EA, 2003 read with Rule 3 of the Electricity Rules 2005 along with Regulations framed by the Commission from time to time.

 

[45 of 2018]
 

07/07/2018 at 10:00 hrs

  10:00

Petition of Maharashtra State Electricity Distribution Co. Ltd.(MSEDCL) under Section 86 (1) (f), (k) and other applicable provisions of the EA, 2003 and in connection with the dispute and differences arising under the standby power agreements dated 13.06.2014, 29.08.2015, 30.06.16 executed between Global Energy Pvt. Ltd. and MSEDCL.

 

[78 of 2018]
 

  

Date will be intimated

  10:00

Petition of Maharashtra State Electricity Distribution Co. Ltd. seeking review of the Order No. 15 of 2017 dated 01.03.2018 in the matter of reduction in the technical minimum of generating units in Maharashtra as per Central Electricity Regulatory Commission norms.

 

[115 of 2018]
 

  

Date will be intimated

  10:00

Review Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for review of order dated 27.02.2018 in Case No. 19 of 2017 passed by the Hon'ble Commission.

 

[123 of 2018]
 

05/07/2018 at 10:00 hrs

  10:00

Implementation of the ATE’s Judgment dated 10 February, 2015 in Appeal No. 70 of 2013 filed by Wardha power company Limited against MERC Case No 53 of 2012 Order dated 27.12.2012. (Petition of Maharashtra State Electricity Distribution Company Ltd. for approval of PPA for additional quantum between Indiabulls Realtech Ltd. (Nashik) and Adani Power Maharashtra Ltd. based on Competitive Bidding Process.)

 

[53 of 2012]
 

05/07/2018 at 10:00 hrs

2018
10:00

Petition of Siddhayu Ayurvedic Research Foundation Private Limited review petition under regulation 85 of MERC (Conduct of Business) Regulations, 2004 read with Section 94 (1) (f) of the Electricity Act, 2003 and in the matter of review of part of Order dated 10.04.2018 in Case No. 83 of 2017 and M. A. No. 16 of 2017 passed by the Hon'ble Commission and in the matter of petition of Siddhayu Ayurvedic Research foundation Pvt. Ltd. regarding non-payment of dues by Global Energy Pvt. Ltd. under the EPA dated 20.09.2012.

 

[141 of 2018]
 

  

Date will be intimated

  10:00

Petition of Siddhayu Ayurvedic Research Foundation Private Limited Petition against Global Energy Private Limited for non-compliance of Order dated 10.04.2018 in Case No. 83 of 2017 and M.A No. 16 of 2017 passed by the Hon'ble Commission.

 

[142 of 2018]
 

  

Date will be intimated

  10:00

Inviting Objections/comments on Nidar Utilities Panvel LLP (NUPLLP) seeking approval of Power Purchase Agreement executed between NUPLLP and M/s The Tata Power Company Limited (Distribution Business) (TPC-D) for procurement of power under the provisions of Section 86 (1) (b) of the Electricity Act, 2003 and the Regulations made there under.

 

Rescheduled Public Notice English

Rescheduled Public Notice Marathi

Public Notice English

Public Notice Marathi

 

Public Hearing Venue: 13th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai 400 005.

 

[ 117 of 2017]
 

  

Date will be intimated

  10:00

Petition of RattanIndia Power Ltd. for Power Purchase Agreement between RPL and MSEDCL for 1200 MW and for issue of directions to MSLDC to accept and schedule the declared capacity of up to 258 MW for all 5 units of Amravati TPS.

 

[59 of 2018]
 

  

Date will be intimated

  10:00

Petition of Hemant Group & Others 3 under Section 86 (1) (e) and Section 86 (2) of the Electricity Act, 2003 read with the Clause 5.12 of the National Electricity Policy dated 12.02.2005 and Clause 6.4 of the Tariff Policy dated 06.01.2006 seeking clarification from the Hon'ble Commission that Renewable Energy Sources also includes Solar Energy meaning thereby that the Renewable Energy Policy dated 14.10.2008 notified by the GoM is a comprehensive policy for all renewable energy including Solar Energy and benefits accruing thereof to projects commissioned under the said policy needs to be passed on to the project developers by the concerned distribution licensees.

 

[126 of 2018]
 

  

Date will be intimated

  10:00

Petition of RattanIndia Power Limited under Section 86 of the Electricity Act, 2003 seeking compensation for penalty imposed by SECL on account of non-procurement of minimum quantity of fuel by RattanIndia under the FSA, due to low despatch by MSEDCL in accordance with Clause 4.5 of Schedule 4 of the PPA between RattanIndia and MSEDCL.

 

[146 of 2018]
 

  

Date will be intimated

  10:00

Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for review of order dated 27.02.2018 in Case No. 19 of 2017 passed by the Commission.

 

[123 of 2018]
 

  

Date will be intimated

  10:00

Implementation of the ATE's Judgment dated 10 February, 2015 in Appeal No. 70 of 2013 filed by Wardha power company Limited against MERC Case No 53 of 2012 Order dated 27.12.2012. (Petition of Maharashtra State Electricity Distribution Company Ltd. for approval of PPA for additional quantum between Indiabulls Realtech Ltd. (Nashik) and Adani Power Maharashtra Ltd. based on Competitive Bidding Process.)

 

[53 of 2012]
 

06/07/2018 at 10:00 hrs

2018
10:00

Petition of Taprath Polymers Pvt. Ltd. against MSEDCL under Section 142 of EA, 2003 for non-compliance of the CGRF, Kalyan, Order No.1415, 1416, 1417 & 1418 dated 16.08.17, 18.08.17, 23.08.17 & 14.09.17 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[54 of 2018]
 

  

Date will be intimated

  10:00

Petition of Harman Plastic Industries against MSEDCL under Section 142 of EA 2003 for non-compliance of the CGRF, Kalyan, Order No.1148 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017. .

 

[55 of 2018]
 

  

Date will be intimated

  10:00

Petition of Sridevi Tools Engineering Pvt. Ltd. against MSEDCL under Section 142 of EA 2003 for non-compliance of the CGRF, Kalyan, Order No.1368, 1375,1389 & 1382 dated 18.08.17,18.08.17,23.08.17&14.09.17 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[56 of 2018]
 

  

Date will be intimated

  10:00

Petition of Swasan Chemicals Pvt. Ltd. against MSEDCL under Section 142 of EA 2003 for non-compliance of the CGRF, Kalyan, Order No.1402,1404,1408 & 1406 dated 16.08.17,18.08.17,23.08.17 & 14.09.17 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[57 of 2018]
 

  

Date will be intimated

  10:00

Petition of Jigar Plast India against MSEDCL under Section 142 of EA 2003 for non-compliance of the CGRF, Kalyan, Order No.1331, 1341, 1359 & 1350 dated 10.08.17, 18.08.17, 23.08.17 & 14.09.17 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[58 of 2018]
 

  

Date will be intimated

  10:00

Petition of Uddhalik Steel Industry against MSEDCL under Section 142 of the Electricity Act, 2003 non-compliance of the CGRF, Latur, Order No.11/2015 dated 08.02.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[66 of 2018]
 

  

Date will be intimated

  10:00

Petition of M/s Nirlep Appliances Private Limited against MSEDCL for non-compliance of CGRF Aurangabad (Rural) Order No. 643/2017 dated 12.09.2017 and MERC Case No. 78 of 2016 dated 13.07.2017.

 

[80 of 2018]
 

  

Date will be intimated

  10:00

Petition of Dr. Hedgewar Hospital against MSEDCL for non-compliance of CGRF Aurangabad Order No. 641/2017 dt 29.08.2017 and MERC Case No. 78 of 2016 dated 13.07.2017.

 

[81 of 2018]
 

  

Date will be intimated

  10:00

Petition of M/s Nirlep Appliances Private Limited against MSEDCL for non-compliance of CGRF Aurangabad (Urban) Order No. 642/2017 dated 29.08.2017 and MERC Case No. 78 of 2016 dated 13.07.2017.

 

[82 of 2018]
 

  

Date will be intimated

  10:00

Petition of M/s Garware Polyester Limited against MSEDCL for non-compliance of CGRF Aurangabad (Urban) Order No. 638/2017 dt. 22.08.2017 and MERC Case No.78 of 2016, dated 13.07.2017.

 

[87of 2018]
 

  

Date will be intimated

  10:00

Petition of M/s Garware Polyester Limited against MSEDCL for non-compliance of CGRF Aurangabad (Urban) Order No. 637/2017 dt. 22.08.2017 and MERC Case No.78 of 2016, dated 13.07.2017.

 

[88 of 2018]
 

  

Date will be intimated

  10:00

Petition of Vidhata Metals Pvt. Ltd against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-Compliance of CGRF Kalyan Zone 4 Orders of consumer no.010519035310 under Section 142 read with 146 of the EA, 2003 for violating these Orders.

 

[182 of 2017]
 

  

Date will be intimated

  10:00

Petition of Sujan Industries Unit No.2 against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for Non-compliance of CGRF Kalyan Zone Order no. 1144/2015-16 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[188 of 2017]
 

  

Date will be intimated

  10:00

Petition of Royal Embroidary Threads P. Ltd against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for Non-compliance of CGRF Baramati Zone Order and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[189 of 2017]
 

  

Date will be intimated

  10:00

Petition of Kundan Engineering Works against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for Non-compliance of CGRF Kalyan Zone 4 Orders and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[190 of 2017]
 

  

Date will be intimated

  10:00

Petition of M/s. Sun Diapet against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of CGRF, Kalyan, and Order K/E/941/1147/2015-16 dated 1.9.2017 and MERC Case No. 78 of 2016 dated 13.07.2017.

 

[1 of 2018]
 

  

Date will be intimated

  10:00

Petition of SVP Packing Industry Pvt. Ltd against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. K/E/958/ 1164/2015-16 dated 1.9.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[2 of 2018]
 

  

Date will be intimated

  10:00

Petition of Agarwal Fasteners Pvt. Ltd against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. K/E/943/ 1149/2015-16 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[3 of 2018]
 

  

Date will be intimated

  10:00

Petition of Ambernath Paper Mills Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. K/E/962/1168/2015-16 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[4 of 2018]
 

  

Date will be intimated

  10:00

Petition of Savex Seal Pvt. Ltd. Now SVP Packing Industry Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. K/E/959/1165/2015-16 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[5 of 2018]
 

  

Date will be intimated

  10:00

Petition of A. B. Corporation against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. K/E/960/1166/2015-16 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[6 of 2018]
 

  

Date will be intimated

  10:00

Petition of MIRC Electronics Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, 4 Orders No. K/E 1)1146//1367/, 2) 1153/1374, 3) 1167/1388, 4) 1160/1381, dated 18.8.2017, 18.8.2017, 13.8.2017 and 14.9.2017 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[7 of 2018]
 

  

Date will be intimated

  10:00

Petition of Vista packaging Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. K/E 1) 1114//1335/, 2) 1123/1344 3) 1140/1362, 4) 1131/1353 dated 23.08.2017, 18.08.2017, 23.08.2017 & 14.09.2017 respectively , and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[8 of 2018]
 

  

Date will be intimated

  10:00

Petition of First Winner Industries Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 964/1170 dated 1.9.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[9 of 2018]
 

  

Date will be intimated

  10:00

Petition of First Winner Industries Ltd. Plot No.N-66 against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 1169 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[10 of 2018]
 

  

Date will be intimated

  10:00

Petition of RLC Engineers Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 1146/2015-16 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[11 of 2018]
 

  

Date will be intimated

  10:00

Petition of Rajesh Plastics against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 1333, 1339, 1357 & 1348 of 2015 dated 10.08.2017,18.08.2017, 23.08.2017 & 14.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[12 of 2018]
 

  

Date will be intimated

  10:00

Petition of Shreenath Chemicals against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 1161 of 2015-16 dated 1.9.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[13 of 2018]
 

  

Date will be intimated

  10:00

Petition of SSB Metal Work against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 1143 of 2015 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[14 of 2018]
 

  

Date will be intimated

  10:00

Petition of First Winner Lifestyles Ltd. Plot No.C-8/1 against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan Order No. 1171 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[15 of 2018]
 

  

Date will be intimated

  10:00

Petition of Industrial Engineering Corporation against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No 1139 of 2015 dated 01.09.2017. and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[16 of 2018]
 

  

Date will be intimated

  10:00

Petition of Arlex Chemi Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 1162 of 2015 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[17 of 2018]
 

  

Date will be intimated

  10:00

Petition of Raychem RPG (P) Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order Nos 1401, 1403, 1407 & 1405 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[18 of 2018]
 

  

Date will be intimated

  10:00

Petition of Shri Arjun L. Raheja against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 1156 of 2015-16 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[19 of 2018]
 

  

Date will be intimated

  10:00

Petition of Shri Amit A. Raheja against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 1157 of 2015-16 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[20 of 2018]
 

  

Date will be intimated

  10:00

Petition of Shri Arjun L Raheja against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 1155 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[21 of 2018]
 

  

Date will be intimated

  10:00

Petition of J. D. Exports against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order 1140 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[22 of 2018]
 

  

Date will be intimated

  10:00

Petition of R. P. Industries against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 1154 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[23 of 2018]
 

  

Date will be intimated

  10:00

Petition of R. P. Industries against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order 1145 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[24 of 2018]
 

  

Date will be intimated

  10:00

Petition of Aditi Die Cast against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order 1159 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[25 of 2018]
 

  

Date will be intimated

  10:00

Petition of Bhulani Steel against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 1151/2015-16 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[26 of 2018]
 

  

Date will be intimated

  10:00

Petition of Bharat Rubber Works Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1370/1377/1391/1384 dated 10.08.17,18.08.17,23.08.17,14.09.17 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[30 of 2018]
 

  

Date will be intimated

  10:00

Petition of Spectrum Scan Pvt. Ltd. Plot 31 against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1474 dated 01.11.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[31 of 2018]
 

  

Date will be intimated

  10:00

Petition of Infra Industries against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1150 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[32 of 2018]
 

  

Date will be intimated

  10:00

Petition of U. V. Metallising India Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1334 / 1343 / 1361 / 1352 dated 23.08.17, 18.08.17, 23.08.17 & 14.09.17 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[33 of 2018]
 

  

Date will be intimated

  10:00

Petition of Vivek Polymer India against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1152 dated 01.09.2017 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[34 of 2018]
 

  

Date will be intimated

  10:00

Petition of Bharat Plastopack Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1371/1378/1392/1385 dated 09.09.17,17.09.17,22.09.17,13.10.17 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[35 of 2018]
 

  

Date will be intimated

  10:00

Petition of Nakki Hospitality Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1330/1340/1358/1349 dated 10.08.17,18.08.17,23.08.17,14.09.17 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[36 of 2018]
 

  

Date will be intimated

  10:00

Petition of Paradise Packaging Pvt. Ltd., against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1336/1345/1363/1354 dated 09.08.17, 18.08.17, 23.08.17, 14.09.17 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[37 of 2018]
 

  

Date will be intimated

  10:00

Petition of Maharashtra Packaging against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1439/1441/1445/1443 dated 10.08.17, 18.08.17, 23.08.17, 14.09.17 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[38 of 2018]
 

  

Date will be intimated

  10:00

Petition of Barcom Industries Limited against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1438/1440/1444/1442 dated 10.08.17, 18.08.17, 23.08.17, 14.09.17 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[39 of 2018]
 

  

Date will be intimated

  10:00

Petition of Mega Rubber Technologies Pvt. Limited against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1142 dated 01.09.17 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[40 of 2018]
 

  

Date will be intimated

  10:00

Petition of Siyesha Industries against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1153 dated 01.09.17 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[41 of 2018]
 

  

Date will be intimated

  10:00

Petition of Royal Garden Resort against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1332/1342/1360/1351 dated 10.08.17/16.08.17/23.08.17/14.09.2017 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[42 of 2018]
 

  

Date will be intimated

  10:00

Petition of Mega Rubber Technologies Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1141 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[43 of 2018]
 

  

Date will be intimated

  10:00

Petition of Spectrum Scan Pvt. Ltd., against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1473 dated 01.11.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.

 

[44 of 2018]
 

  

Date will be intimated

  10:00

Implementation of the ATE's Judgment dated 10 February, 2015 in Appeal No. 70 of 2013 filed by Wardha power company Limited against MERC Case No 53 of 2012 Order dated 27.12.2012. (Petition of Maharashtra State Electricity Distribution Company Ltd. for approval of PPA for additional quantum between Indiabulls Realtech Ltd. (Nashik) and Adani Power Maharashtra Ltd. based on Competitive Bidding Process.)

 

[53 of 2012]
 

  

Date will be intimated

2018
10:00

Petition of Essar Steel India Limited (ESIL) against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) seeking exemption from Cross Subsidy Surcharge as Essar Steel India Limited is a captive user in accordance with Section 42 of the EA, 2003 read with Rule 3 of the Electricity Rules 2005 along with Regulations framed by the Commission from time to time.

 

[45 of 2018]
 

  

Date will be intimated

  10:00

Petition of SDPL Paradise Apartment & 12 others for directing MSEDCL to comply Electricity Ombudsman Order No. 43 of 2017.

 

[97 of 2018]
 

  

Date will be intimated

  10:00

Petition of Shri Mangesh Madhukar Pandit against MSEDCL for Non Compliance of MERC Order in Case No. 44 of 2017 dated 16.02.2018.

 

[111 of 2018]
 

  

10/09/2018 at 10:00 hrs

  10:00

Petition of Shri Vishnu Ramdas Chavan against MSEDCL under Section 142 of Electricity Act, 2003 and under Regulation 22 of MERC (CGRF) Regulations, 2006. Disconnection of Electricity supply without Notice as per Section 56(1) Electricity Act, of 2003.

 

[117 of 2018]
 

  

Date will be intimated

  10:00

Petition of Shri Ramdas Shripati Chavan against MSEDCL under Section 142 of Electricity Act, 2003 and under Regulation 22 of MERC (CGRF) Regulations, 2006 Petition against Electricity Ombudsman Order dated 26.02.2018 passed in Representation No. 18 of 2018

 

[118 of 2018]
 

  

Date will be intimated

  10:00

Petition of M/s Navjeevan Hybrid Seeds Corporation under Section 142 & 146 of Electricity Act, 2003 for non compliance of Hon’ble Commission Order dt. 09.12.2016 in Case No. 04/2015.

 

[139 of 2018]
 

  

Date will be intimated

  10:00

Petition of Addnode India Private Limited for non-compliance by MSEDCL of CGRF Order, Mumbai’s Order No.371 dated.13 March, 2018 in Case No. 63 of 2018.

 

[157 of 2018]
 

  

Date will be intimated

  10:00

Petition of Sagir Ahmed Munir Ahmed (Bhiwandi Electricity Users Welfare Association) against MSEDCL for non compliance of Order of the CGRF 11/2017 dated 11/07/2017 and Order of the Electricity Ombudsman 13/2018 dated 26/02/2018.

 

[162 of 2018]
 

  

10/09/2018 at 10:00 hrs

  10:00

Petition of M/s. Sandeep Dwellers Pvt. Ltd. for directing MSEDCL and/or its franchisee at Nagpur M/s. SND Limited, to Comply Hon. Ombudsman’s Order No. 34/2017 passed on 28th July, 2017 and Review Petition Order No. 3/2017 passed on 6th Mar, 2018.

 

[177 of 2018]
 

  

Date will be intimated

  10:00

Petition of M/s Vinchurkar-Pawar Diagnostic Centre against MSEDCL for non-compliance of Judgement / Order dated 11.04.2017 passed by CGRF, Nashik Zone in Case No. 76/16- 17.

 

[107 of 2018]
 

  

10/09/2018 at 10:00 hrs

2018
10:00

Petition of Ultra mega Power Private Limited (formerly known as R.S. India Power Limited) for seeking directions for Procurement of power from the wind power projects of the Petitioner by Respondent No. 1 under Section 62(1)(a) of the Electricity Act, 2003 read with the MERC (RPO, its Compliance and Implementation of Renewable Energy Certificate Framework) Regulations, 2016, to fulfil the RPO of the Respondent No. 1 based on the Government of Maharashtra Policy dated 20.7.2015 and 9.9.2015, and adjudication under Section 86(1)(f) of the 2003 Act.

 

[121 of 2018]
 

  

16/07/2018 at 10:00 hrs

  10:00

Miscellaneous Petition of Dhariwal Infrastructure Limited under Section 86 (1) (a), (f) and 62 (6) of the Electricity Act, 2003 read with Regulations 32 of MERC (Conduct of Business) Regulations, 2004 seeking appropriate direction for refund of the excess amount recovered by MSEDCL on account of supply of Start-up Power to Unit 1 of the generating station of Dhariwal Infrastructure Limited located at Tadali, Chandrapur for the period from September 2013 to May 2015 under "HT-Commercial" category instead of "HT-Industrial" category.

 

[67 of 2018]
 

  

16/07/2018 at 10:00 hrs

  10:00

Petition of RattanIndia Power Limited under Section 86 (1) (f) read with Section 129 and 62 (6) and other applicable provisions of the EA,2003 for seeking directions of the Commission for change in consumer category from HT-II Commercial to HT-I Industrial for 12.5 MVA Start-up Power connection and refund / adjustment of additional tariff collected by MSEDCL under wrong category.

 

[68 of 2018]
 

  

16/07/2018 at 10:00 hrs

  10:00

Petition of Adani Power Maharashtra Limited under Section 86 of the Electricity Act, 2003 read with Article 13 ("Change in Law") of PPA dated 08.09.2008 and Article 10 ("Change in Law") under the PPA dated 31.10.2010, 09.08.2010 and 16.02.2013 executed between MSEDCL and APML for appropriate adjustment in tariff due to "Change in Law" which substantially affects cost and revenue of the project.

 

[124 of 2018]
 

  

16/07/2018 at 10:00 hrs

  10:00

Petition of M/s. Prithvi Ferro Alloys Pvt. Limited for disputes between the Petitioner and the Respondent pertaining to settlement/ netting of start-up power entirely consumed by the Petitioner, application for appropriate tariff category for start-up power and consequent relief of refund of charges to the Petitioner towards excess start up power charges paid during April 2014 to May 2015(13 months) is Rs.88,63,101.43/- and consequent reliefs.

 

[161 of 2018]
 

  

16/07/2018 at 10:00 hrs

2018
10:00

Review Petition of Maharashtra State Power Generation Company Limited (MSPGCL) under Section 94 of the Electricity Act, 2003 and Regulation 85 of MERC (Conduct of Business) Regulations, 2004 against order dated 14.12.2017 in Case No. 59 of 2017 on a Petition filed by MSPGCL seeking approval of Capital Cost and Tariff of Koradi generating Units 8, 9 & 10 Chandrapur Units 8 & 9 and Parli Unit 8.

 

[77 of 2018]
 

01/07/2018 at 10:00 hrs

2018
10:00

Inviting comments in proceedings for verification of Renewable Purchase Obligation compliance targets for FY 2016-17 by distribution Licensees in Maharashtra.

Public Notice Marathi

Submission by MEDA


Case No 207 of 2017 Submission by MSEDCL
Case No 208 of 2017 Submission by BEST
Case No 209 of 2017 Submission by TPC-D
Case No 210 of 2017 Submission by RInfra-D
Case No 211 of 2017 Submission by Indian Railways
Case No 212 of 2017 Submission by Mindspace Business Park Pvt. Ltd.
Case No 213 of 2017 Submission by Gigaplex Estate Pvt. Ltd

 

Public Hearing Venue: 13th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Colaba, Mumbai-400005.

 

[ 207 of 2017, 208 of 2017, 209 of 2017, 210 of 2017, 211 of 2017, 212 of 2017 and 213 of 2017]
 

  

2018
10:00

Petition of Ultra mega Power Private Limited (formerly known as R.S. India Power Limited) for seeking directions for Procurement of power from the wind power projects of the Petitioner by Respondent No. 1 under Section 62(1)(a) of the Electricity Act, 2003 read with the MERC (RPO, its Compliance and Implementation of Renewable Energy Certificate Framework) Regulations, 2016, to fulfil the RPO of the Respondent No. 1 based on the Government of Maharashtra Policy dated 20.7.2015 and 9.9.2015, and adjudication under Section 86(1)(f) of the 2003 Act.

 

[121 of 2018]
 

  

  10:00

Miscellaneous Petition of Dhariwal Infrastructure Limited under Section 86 (1) (a), (f) and 62 (6) of the Electricity Act, 2003 read with Regulations 32 of MERC (Conduct of Business) Regulations, 2004 seeking appropriate direction for refund of the excess amount recovered by MSEDCL on account of supply of Start-up Power to Unit 1 of the generating station of Dhariwal Infrastructure Limited located at Tadali, Chandrapur for the period from September 2013 to May 2015 under "HT-Commercial" category instead of "HT-Industrial" category.

 

[67 of 2018]
 

  

  10:00

Petition of RattanIndia Power Limited under Section 86 (1) (f) read with Section 129 and 62 (6) and other applicable provisions of the EA,2003 for seeking directions of the Commission for change in consumer category from HT-II Commercial to HT-I Industrial for 12.5 MVA Start-up Power connection and refund / adjustment of additional tariff collected by MSEDCL under wrong category.

 

[68 of 2018]
 

  

  10:00

Petition of Adani Power Maharashtra Limited under Section 86 of the Electricity Act, 2003 read with Article 13 ("Change in Law") of PPA dated 08.09.2008 and Article 10 ("Change in Law") under the PPA dated 31.10.2010, 09.08.2010 and 16.02.2013 executed between MSEDCL and APML for appropriate adjustment in tariff due to "Change in Law" which substantially affects cost and revenue of the project.

 

[124 of 2018]
 

  

  10:00

Petition of M/s. Prithvi Ferro Alloys Pvt. Limited for disputes between the Petitioner and the Respondent pertaining to settlement/ netting of start-up power entirely consumed by the Petitioner, application for appropriate tariff category for start-up power and consequent relief of refund of charges to the Petitioner towards excess start up power charges paid during April 2014 to May 2015(13 months) is Rs.88,63,101.43/- and consequent reliefs.

 

[161 of 2018]
 

  

  10:00

Petition of Essam Gas Pvt. Ltd seeking clarifications as to the applicability of its Tariff Order dated 03.11.2016 in Case No. 48 of 2016 on the issue of exceeding Contract Demand during night hours and directing the Respondent MSEDCL to extend full benefits of Load Factor Incentives to the Petitioner.

 

[60 of 2018]
 

  

  10:00

Petition of Dhariwal Industries Limited & Anr under Section 86 (1) (d) and Section 86 (1) (k) seeking direction to Global Energy Private Limited (Trading Licensee) to honor the terms of the EPA entered between the Petitioners and Respondent and to release the admitted outstanding payments immediately alongwith interest.

 

[160 of 2018]
 

  

  10:00

Petition of Maharashtra Airport Development Company Limited for approval and directions under Section 86 of the Electricity Act, 2003 read with 'Guidelines for short-term (i.e. for a period of more than one day to one year) Procurement of Power by Distribution Licensees' dated 30th March 2016 issued by the Ministry of Power, Government of India.

 

[191 of 2018]
 

  

  10:00

Petition of M/s. Gigaplex Estate Private Limited (GEPL), for approval of the Hon'ble Commission's to allow deviations from Ministry of Power's Model Bidding Documents for Medium Term Procurement of Power for its Licenced Area.

 

[207 of 2018]
 

  

2018
10:00

Inviting Suggestions & Objections on Jaigad PowerTrasco Ltd's Petition for approval of Truing up of FY 2015-16 and FY 2016-17, Provisional Truing up of 2017-18 and Revised Forecast of ARR for FY 2018-19 & FY 2019-20.

 

Rescheduled Public Notice English

Rescheduled Public Notice Marathi

Public Notice English

Public Notice Marathi

Executive Summary English

Executive Summary Marathi

 

Public Hearing Venue: 13th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai 400 005.

 

[ 167 of 2017]
 

  

  10:00

Inviting Suggestions/Objections on Maharashtra State Load Despatch Centre's Petition for Truing up of FY 2015-16 and FY 2016-17, Provisional Truing-up of FY 2017-18, and revised estimates for Aggregate Revenue Requirement and Determination of Fees and Charges for FY 2018-19 and FY 2019-20

 

Rescheduled Public Notice English

Rescheduled Public Notice Marathi

Public Notice English

Public Notice Marathi

Executive Summary English

Executive Summary Marathi

 

Public Hearing Venue: 13th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai 400 005.

 

[ 171 of 2017]
 

  

  10:00

Suggestions/Objections on Maharashtra State Electricity Transmission Co. Ltd.’s Petition forTruing-up for FY 2015-16 and FY 2016-17, Provisional Truing-up for FY 2017-18 and revised estimates of Aggregate Revenue Requirements (ARR)forFY 2018-19and FY 2019-20 along with Impact of Past Period Disallowed Capitalisation for FY 2010-11 to FY 2014-15

 

Public Notice English

Public Notice Marathi

Executive Summary English

Executive Summary Marathi

 

Public Hearing Venue: 13th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai 400 005.

 

[ 168 of 2017]
 

  

2018
10:00

Inviting Suggestions/Objections on Maharashtra Eastern Grid Power Transmission Company Ltd.’s Petitionfor Truing Up of ARR for FY 2015-16 and FY 2016-17, Provisional truing-up for FY 2017-18 and revised ARR estimate for FY 2018-19 and FY 2019-20.

 

Public Notice English

Public Notice Marathi

Executive Summary English

Executive Summary Marathi

 

Public Hearing Venue: 13th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai 400 005.

 

[ 169 of 2017]
 

  

  10:00

Inviting Suggestions/Objections on Adani Transmission (India) Limited’s Petition for Truing Up of ARR for FY 2015-16 & FY 2016-17, Provisional Truing Up for FY 2017-18 and Revised ARR Forecast for FY 2018-19 and FY 2019-20

 

Public Notice English

Executive Summary English

Executive Summary Marathi

 

Public Hearing Venue: 13th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai 400 005.

 

[ 170 of 2017]
 

  

  10:00

Inviting Suggestions/Objections on Petition of The Tata Power Company Limited – Transmission for Truing up for FY 2015-16 & FY 2016-17, Provisional Truing up for FY 2017-18 and Revised ARR forecast from FY 2018-19 to FY 2019-20.

 

Public Notice English

Public Notice Marathi

Executive Summary English

Executive Summary Marathi

 

Public Hearing Venue: 13th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai 400 005.

 

[ 204 of 2017]
 

  

  10:00

Inviting Comments on Application of the Tata Power Company Ltd. for amendment of Transmission Licence under Section 18 of the Electricity Act, 2003.

 

Public Notice English and Marathi

Petition

Additional Submission

Data Gaps-I

Data Gaps-II

Data Gaps-III

Responses to TVS Queries

STU Report

 

Public Hearing Venue: 13th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai 400 005.

 

[ 137 of 2016]
 

  

2018
10:00

Petition filed by Reliance Infrastructure Limited - Transmission  (RInfra-T) for approval of Truing - up of for FY 2015-16 & FY 2016-17; Provisional Truing-up of ARR for FY 2017-18   and approval of ARR for FY 2018-19 to FY 2019-20

 

Public Notice English

Public Notice Marathi

Executive Summary English

Executive Summary Marathi

 

Public Hearing Venue: 13th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai 400 005.

 

[ 201 of 2017]
 

  

  10:00

Inviting Suggestions/Objections on Amravati Power Transmission Company Limited’s Petition for approval of Truing-up for FY 2015-16 & FY 2016-17, Provisional Truing-up for FY 2017-18 and revised estimates of Aggregate Revenue Requirement (ARR) for FY 2018-19 & FY 2019-20

 

Public Notice English

Public Notice Marathi

Executive Summary English

Executive Summary Marathi

 

Public Hearing Venue: 13th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai 400 005.

 

[ 197 of 2017]
 

  

  10:00

Inviting Comments on RInfra-Generation’s Petition for True up of FY 2015-16 and FY 2016-17, Provisional True up of FY 2017-18, Revised Aggregate Revenue Requirement of FY 2018-19 and FY 2019-20 and determination of Tariff (Case No. 202 of 2017)

 

Public Notice English

Public Notice Marathi

Executive Summary English

Executive Summary Marathi

 

Public Hearing Venue: 13th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai 400 005.

 

[ 202 of 2017]
 

  

2018
10:00

Inviting Suggestions/Objections on Vidarbha Industries Power Limited's Petition for approval of Truing-up for FY 2015-16 & FY 2016-17, Provisional Truing-up for FY 2017-18 and revised estimates of Aggregate Revenue Requirement (ARR) for FY 2018-19 & FY 2019-20 for its Transmission Business

 

Public Notice English

Public Notice Marathi

Executive Summary English

Executive Summary Marathi

 

Public Hearing Venue: 13th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai 400 005.

 

[ 198 of 2017]
 

  

  10:00

Inviting Suggestions/Objections on Petition of The Tata Power Company Limited - Generation Business for Truing up for FY 2015-16 & FY 2016-17, Provisional Truing up for FY 2017-18 and Revised ARR forecast from FY 2018-19 to FY 2019-20.

 

Public Notice English

Public Notice Marathi

Executive Summary English

Executive Summary Marathi

 

Public Hearing Venue: 13th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai 400 005.

 

[ 65 of 2018]
 

  

  10:00

Inviting Suggestions/Objections on Maharashtra State Power Generation Company Limited Petition for approval of final True-up for FY 2015-16 and FY 2016-17, provisional True-up for FY 2017-18 and Revised Aggregate Revenue Requirement for FY 2018-19 and FY 2019-20 and determination of Tariff

 

Public Notice English

Public Notice Marathi

Executive Summary English

Executive Summary Marathi

 

Public Hearing Venue: 13th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai 400 005.

 

[ 196 of 2017]
 

  

2018
10:00

Review Petition of Adani Power Maharashtra Limited under Section 94(1)(f) of the Electricity Act, 2003 read with Regulation 85 of the MERC (Conduct of Business Regulations), 2004 against the Order dated March 07, 2018 pronounced by the Hon’ble Commission in Case No. 189 of 2013 and Case No. 140 of 2014.

 

[167 of 2018]
 

  10:00

Miscellaneous Application filed by Vidarbha Industries Power Limited (Generation Business) seeking liberty to amend the existing Petition 91 of 2015 to raised additional grounds and prayers.

 

[M. A. 03 of 2018 in Case No. 91 of 2015]
 

  10:00

Miscellaneous Application filed by Vidarbha Industries Power Limited (Generation Business) seeking liberty to amend the existing Petition 199 of 2017 to raised additional grounds and prayers.

 

[M. A. 04 of 2018 in Case No. 199 of 2017]
 

2018
10:00

Inviting Comments, Suggestions and/or Objections on Draft Generic Tariff Order for Renewable Energy Technologies for FY 2018-19

 

Public Notice English

Public Notice Marathi

Draft RE Generic Tariff Order for FY 2018-19

 

Public Hearing Venue: 13th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai 400 005.

 

[ 204 of 2018]
 

  

  10:00

Inviting Objections/comments on Nidar Utilities Panvel LLP (NUPLLP) seeking approval of Power Purchase Agreement executed between NUPLLP and M/s The Tata Power Company Limited (Distribution Business) (TPC-D) for procurement of power under the provisions of Section 86 (1) (b) of the Electricity Act, 2003 and the Regulations made there under.

 

Public Notice English

Public Notice Marathi

 

Public Hearing Venue: 13th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai 400 005.

 

[ 117 of 2017]
 

  10:00

Petition of Dhariwal Industries Limited & Anr under Section 86 (1) (d) and Section 86 (1) (k) seeking direction to Global Energy Private Limited (Trading Licensee) to honor the terms of the EPA entered between the Petitioners and Respondent and to release the admitted outstanding payments immediately alongwith interest.

 

[160 of 2018]
 

       

 

Home ABOUT US PHOTO GALLERY ORDERS RULES AND REGULATIONS PRESS RELEASE COMPLAINTS OTHER LINKS CONTACT US

IMPORTANT: Maharashtra Electricity Regulatory Commission to ensure the accuracy of information furnished in this website, MERC does not accept any responsibility or liability for any damage or loss to any person for the result of any action taken on the basis of these information. However, MERC shall be obliged if errors / omissions are brought to its notice for carrying out corrections in the next update.

DESIGNED, DEVELOPED & MAINTAINED BY:
Maharashtra Electricity Regulatory Commission
Best View at 800 * 600 resolution and IE 4 & Above
© Copyright MERC 2002 © Copyright MERC 2002