Events for January, 2019

To view copy of Event Notice Click on Underlined HOUR
2019
10:00

Petition filed by Adani Power Maharashtra Limited under Section 86 read with Section 63 of the Electricity Act, 2003 and Article 13/10 of the PPAs dated 08.09.2008 and dated 31.03.2010, 09.08.2010 & 16.02.2013 for approval of grant of Carrying Cost.

 

[343 of 2018]
 

  

 

  10:00

Petition of M/s Shree Cement Limited under section 86 (1) (E) of the Electricity Act, 2003 seeking amendment in Regulation 2(4) and 20.1 of MERC (DOA) Regulations, 2016 and clarification W.R.T simultaneous of Open Access facility and Banking of Power from Co-located RE Power Plant by an eligible Industrial Consumer.

 

[269 of 2018]
 

  

 

 

  10:00

Petition of M/s Fabtech Projects & Engineers Limited under Section 142 & 146 for Non-Comopliance of the DOA Regulations 2016 by MSEDCL and seeking directions for restoration of the Petitioner's Contract Demand for the billing month August 2016 and consequential reliefs from the MSEDCL.

 

[272 of 2018]
 

  

 

  10:00

Petition of Suzlon Energy Limited for seeking refund / compensation for erecting evacuation infrastructure installed for connecting renewable energy project to the grid.

 

[228 of 2018]
 

  

 

2019
10:00

Petition of INOX Air Products Private Limited under Section 86(1)(f) of the Electricity Act, 2003 with regard to wrongful denial of load factor incentive and non-compliance of Orders of this Hon'ble Commission specifically the Order dated September 12, 2018 in Case No. 195 of 2017 read with Orders dated May 8, May 29 and July 31, 2018 of the Hon'ble Appellate Tribunal for Electricity in O.P. No. 2 of 2018.

 

[368 of 2018]
 

 

2019
10:00

Public Hearing on VIPL-Generation's Petition for Revised Truing up of ARR for FY 2014-15, Truing up of ARR for FY 2015-16 and FY 2016-17, Provisional Truing up of ARR for FY 2017-18, Revised ARR and Tariff for FY 2018-19 and FY 2019-20

 

Public Notice English

Public Notice Marathi

Old Public Notice English

Old Public Notice Marathi

Executive Summary English

Executive Summary Marathi

 

Notice for change in Venue English

Notice for change in Venue Marathi

Public Hearing Venue: Centrum Hall, 1st Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai 400 005.

 

[ 199 of 2017]
 

 

 

2019
10:00

Petition of Maharashtra State Power Generation Company Limited for removal of difficulties by invoking power to relax for approval and adoption of tariff and approval PPA for long term procurement of 50 MW solar power from solar power plant at kaudgaon.

 

[354 of 2018]
 

 

  10:00

Petition filed by Adani Power Maharashtra Limited under Section 86 read with Section 63 of the Electricity Act, 2003 and Article 13/10 of the PPAs dated 08.09.2008 and dated 31.03.2010, 09.08.2010 & 16.02.2013 for approval of grant of Carrying Cost.

 

[343 of 2018]
 

 

 

  10:00

Petition of M/s Shree Cement Limited under section 86 (1) (E) of the Electricity Act, 2003 seeking amendment in Regulation 2(4) and 20.1 of MERC (DOA) Regulations, 2016 and clarification W.R.T simultaneous of Open Access facility and Banking of Power from Co-located RE Power Plant by an eligible Industrial Consumer.

 

[269 of 2018]
 

 

 

  10:00

Petition of M/s Fabtech Projects & Engineers Limited under Section 142 & 146 for Non-Comopliance of the DOA Regulations 2016 by MSEDCL and seeking directions for restoration of the Petitioner's Contract Demand for the billing month August 2016 and consequential reliefs from the MSEDCL.

 

[272 of 2018]
 

 

 

  10:00

Petition of Suzlon Energy Limited for seeking refund / compensation for erecting evacuation infrastructure installed for connecting renewable energy project to the grid.

 

[228 of 2018]
 

 

  10:00

Petition filed by Maharashtra Metro Rail Corporation Ltd. seeking Review of Order dated 16.01.2018 passed in Case No. 133 of 2016 (Petition of Maharashtra Metro Rail Corporation Ltd. seeking relaxation in the capacity limits for eligibility under the Roof-top Solar PV Net Metering Regulations, 2015.)

 

[286 of 2018]

 

 

 

  10:00

Petition of Tata Power Company Limited - T for withdrawing the deemed closure directive and allowing Tata power - T to continue implementation of DPR schemes of "400 kV Receiving Station at Vikhroli", "400 kV Kharghar-Vikhroli Transmission Line” and "LILO of 400 kV Talegaon-Kalwa Line at 400 kV Vikhroli Receiving Station.

 

[3 of 2019]
 

 

2019
10:00

Interim application filed in case no 174 of 2018 Review Petition of M/s Topworth Urja and Metals Limited under Sections 94 of the Electricity Act, 2003 Read With Regulation 85,92,93,94 and 95 of the MERC (Conduct of Business) Regulations, 2004 Review of the Order dated 4th May, 2018 passed in Case No.5 of 2016.

 

[MA No. 2 of 2019 in 174 of 2018]
 

 

2019
10:00

Petition filed by Adani Electricity Mumbai Limited (Distribution) seeking clarification and/or issuance of practice directions to implement the Order dated 12.06.2017 in Case No. 182 of 2014 in respect of applications for new consumers under Scenario 53 (a).

 

[345 of 2018]
 

  

 

  10:00

Petition of Shri. Rajesh s/o Mahadeorao Babhulkar under Section 67 (2) (e) of Electricity Act 2003 r/w rule 13 (3) of Maharashtra Electricity work license rules 2012 for the determination of valuation and payment of compensation of neera of palm tree (sindi tree).

 

[253 of 2018]
 

 

  10:00

The Petitioner Shri Veera Vaha Rathod has filed the Petition on 09.10.2018 regarding compensation for Transmission works on his land as per-Section 67(2-E) of the Electricity Act, 2003 and Rule 13(3) of Maharashtra Electricity Works of Licensees Rules, 2012.

 

[283 of 2018]
 

 

  10:00

Petition of M/s SEP Energy Private Ltd. under Sections 9 read with 42 (2) read with 49 read with 61 read with 62 read with 66 read with 86 (1) (f) read with 86 (3) and (4) of Electricity Act, 2003 read with Regulation 32 of MERC (Distribution Open Access) Regulations, 2016.

 

[291 of 2018]
 

 

  10:00

Petition of MSEDCL seeking recovery of annual fixed cost component in respect of MSEDCL for the energy supplied to the State pool, recovery of differential amount to be recovered towards variable rate, removal of anomalies and directions in regards to overdrawal by Mumbai utilities in Balancing and Settlement Mechanism as per provision of ABT Order dated 17.05.2007 in Case No 42 of 2006.

 

[297 of 2018]
 

 

2019
10:00

Petition filed by Adani Electricity Mumbai Limited (Distribution) seeking clarification and/or issuance of practice directions to implement the Order dated 12.06.2017 in Case No. 182 of 2014 in respect of applications for new consumers under Scenario 53 (a).

 

[345 of 2018]
 

 

  10:00

Petition of M/s. Marigold Pharmaceuticals Pvt. Limited under Sections 94 of the Electricity Act, 2003 read With Regulation 85 and various regulations of the MERC (Conduct of Business) Regulations, 2004. Filing for Review for the Order dated 22/11/2018 passed in Case No.210 of 2018.

 

[352 of 2018]
 

 

  10:00

Petition filed by Kolhapur Chamber of Commerce & Industries wrong methodology for applying PF penalty/incentive Order dated 12.09.2018, passed by this Hon’ble Commission's in Case No.195 of 2018.

 

[362 of 2018]
 

 

  10:00

Petition of Shri Dilip John Benjamin regarding non-compliance of the Electricity Ombudsman, Nagpur Order No. 11/2018 dated 20.07.2018 by Maharashtra State Electricity Distribution Co. Ltd.

 

[365 of 2018]
 

 

  10:00

Petition of Shri Ramdas Narayan Wanjari regarding non-compliance of the Electricity Ombudsman, Nagpur Order No. 12/2018 dated 20.07.2018 by Maharashtra State Electricity Distribution Co. Ltd.

 

[366 of 2018]
 

 

2019
10:00

Petition of Tata Power Renewable Energy Limited under Section 63 of the Electricity Act, 2003 for approval and determination of compensation on account of Change in Law for Solar Project.

 

[276 of 2018]
 

 

  10:00

Petition filed by M/s. Adani Renewable Energy (RJ) Limited under Section 86(1)(b) and Section 86(1)(f) of the Electricity Act, 2003 read with Article 9 of the PPA dated 27.07.2018, executed between Adani Renewable Energy (RJ) Limited and MSEDCL, for seeking approval of Change in Law events due to promulgation of levy of Safeguard Duty on the import of Solar Cells, whether or not assembled in modules or panels, by Ministry of Finance, Department of Revenue’s Notification No. 01/2018-Customs (SG) dated 30.07.2018.

 

[325 of 2018]
 

 

  10:00

Petition filed by M/s. ACME Chittorgarh Solar Energy Private Limited for seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of imposition of safeguard duty on the import of solar cells and modules.

 

[340 of 2018]
 

 

  10:00

Petition of M/s Adani Power Maharashtra Limited under Section 86(1)(b) and Section 86(1)(f) of the Indian Electricity Act, 2003 seeking amounts due to the Petitioner from the Respondents under the Power Purchase Agreements dated 08.09.2008, 31.03.2010, 09.08.2010 and 16.2.2013 entered between parties for supply of electricity in bulk for the aggregate contracted capacity of 1320 MW, 1200 MW, 125 MW and 440 MW under the respective PPAs.

 

[296 of 2018]
 

 

  10:00

Petition of Adani Power Maharashtra Limited under Section 86 of the Electricity Act, 2003 read with Article 13/10 ("Change in Law") of the Power Purchase Agreement dated 8.09.2008 and 31.03.2010 / 09.08.2010 / 26.02.2013 for 1320MW and 1200 MW/125 MW/440 MW respectively executed between Adani Power Maharashtra Limited and Maharashtra State Electricity Distribution Company Limited in respect of mandatory installation of additional systems in compliance with the Environment (Protection) Amendment Rules, 2015 issued by the Ministry of Environment, Forest and Climate Change dated 07.12.2015 for thermal power stations.

 

[300 of 2018]
 

 

  10:00

Petition under Section 86 of the Electricity Act, 2003 read with Article 13/10 ("Change in Law") of the Power Purchase Agreement dated 8.09.2008 and 31.03.2010 / 09.08.2010 / 26.02.2013 for 1320MW and 1200 MW/125 MW/440 MW respectively executed between Adani Power Maharashtra Limited and Maharashtra State Electricity Distribution Company Limited in respect of relief for additional cost of Transportation in compliance with the Notification issued by the Ministry of Environment, Forest and Climate Change dated 25.01.2016.

 

[301 of 2018]
 

 

2019
10:00

Petition of Gateway Terminals India Private Limited under Section 62 (6) of the Electricity Act, 2003 for an unlawful Tariff charged from the Petitioner by the Respondent by way of a Levy of 20% service charge as per Article 8.19 of a License agreement executed between the Petitioner and Respondent.

 

[247 of 2018]
 

 

  10:00

Petition of Shri Suraj Ashok Nikam (M/s. Sai Agro Industries) regarding non-compliance of the Electricity Ombudsman, Mumbai Order No. 75/2018 dated 06.07.2018 by Maharashtra State Electricity Distribution Co. Ltd.

 

[353 of 2018]
 

 

  10:00

Petition of M/s Adani Power Maharashtra Limited under Section 86(1)(b) and Section 86(1)(f) of the Indian Electricity Act, 2003 seeking amounts due to the Petitioner from the Respondents under the Power Purchase Agreements dated 08.09.2008, 31.03.2010, 09.08.2010 and 16.2.2013 entered between parties for supply of electricity in bulk for the aggregate contracted capacity of 1320 MW, 1200 MW, 125 MW and 440 MW under the respective PPAs.

 

[296 of 2018]
 

  

 

  10:00

Petition of Adani Power Maharashtra Limited under Section 86 of the Electricity Act, 2003 read with Article 13/10 ("Change in Law") of the Power Purchase Agreement dated 8.09.2008 and 31.03.2010 / 09.08.2010 / 26.02.2013 for 1320MW and 1200 MW/125 MW/440 MW respectively executed between Adani Power Maharashtra Limited and Maharashtra State Electricity Distribution Company Limited in respect of mandatory installation of additional systems in compliance with the Environment (Protection) Amendment Rules, 2015 issued by the Ministry of Environment, Forest and Climate Change dated 07.12.2015 for thermal power stations.

 

[300 of 2018]
 

  

 

  10:00

Petition under Section 86 of the Electricity Act, 2003 read with Article 13/10 ("Change in Law") of the Power Purchase Agreement dated 8.09.2008 and 31.03.2010 / 09.08.2010 / 26.02.2013 for 1320MW and 1200 MW/125 MW/440 MW respectively executed between Adani Power Maharashtra Limited and Maharashtra State Electricity Distribution Company Limited in respect of relief for additional cost of Transportation in compliance with the Notification issued by the Ministry of Environment, Forest and Climate Change dated 25.01.2016.

 

[301 of 2018]
 

  

 

  10:00

Petition of Tata Power Company Limited Review in Case No 265 of 2018 dated 12th September, 2018 in the matter of Revision of transmission Tariff determined in Order dated 22nd July, 2016 in Case No. 91 of 2016 in pursuance of Mid-term Review process.

 

[361 of 2018]
 

 

2019
10:00

Petition of CLP Wind Farms (India) Private Limited under Section 86(1) (f) of the Electricity Act, 2003 for pertaining to adjudication of disputes between CLP Wind Farms (India) Private Limited and Maharashtra State Electricity Distribution Co. Limited.

 

[355 of 2018]
 

  

 

  10:00

Petition of CLP Wind Farms (India) Private Limited against non-compliance by Maharashtra State Electricity Distribution Company Limited of the Order dated March 16, 2017 of the Hon'ble Commission read with relevant provisions of the Electricity Act, 2003 in Case No. 75 of 2016.

 

[356 of 2018]
 

  

 

  10:00

Petition of CLP Wind Farms (Khandke) Private Limited under Section 86(1) (f) of the Electricity Act, 2003 for pertaining to adjudication of disputes between CLP Wind Farms (Khandke) Private Limited and Maharashtra State Electricity Distribution Co. Limited.

 

[357 of 2018]
 

  

 

  10:00

Petition of CLP Wind Farms (Khandke) Private Limited against non-compliance by Maharashtra State Electricity Distribution Company Limited of the Order dated March 16, 2017 of the Hon'ble Commission read with relevant provisions of the Electricity Act, 2003 in Case No. 74 of 2016.

 

[358 of 2018]
 

  

 

  10:00

Petition of Shri Dilip Bhikaji Dethe against Maharashtra Eastern Grid Power Transmission Company, Akola for non-compliance of the MERC Order and non compliance of Order passed by Sub Divisional Magistrate Order, Buldhana.

 

[359 of 2018]
 

  

 

  10:00

Case of INOX Air Products Private Limited seeking directions against Maharashtra State Electricity Distribution Company Limited for wrongful denial of load factor incentive in the bill raised for the month of November, 2018.

 

[368 of 2018]
 

 

  10:00

Petition filed by Bhadreshwar Vidyut Private Limited against wrongful imposition of Cross Subsidy Surcharge (CSS) by the Maharashtra State Electricity Distribution Company Limited (MSEDCL) on the captive users of M/s Bhadreshwar Vidyut Private Limited availing Open Access for the FY 2015-16.

 

[323 of 2018]
 

 

  10:00

Petition filed by Bhadreshwar Vidyut Private Limited against wrongful imposition of Cross Subsidy Surcharge (CSS) and Additional Surcharge by the Maharashtra State Electricity Distribution Company Limited (MSEDCL) on the captive users of M/s Bhadreshwar Vidyut Private Limited availing Open Access for the FY 2016-17.

 

[324 of 2018]
 

 

  10:00

Petition filed by Bhadreshwar Vidyut Private Limited in accordance with the Order passed by this Hon'ble Commission in Case No. 175 of 2018 dated 22.10.2018 against unlawful action of Maharashtra State Electricity Distribution Company Limited (MSEDCL) in issuing the letter dated 20.12.2018, thereby maintaining its stand as was communicated through their earlier letter dated 15.10.2018 thereby making the captive users of the Petitioner liable to pay Cross Subsidy Surcharge and Additional Surcharge for the power procured for captive use in FY 2017-18.

 

[372 of 2018]
 

 

  10:00

Petition of Sai Wardha Power Generation Limited for directions to the Respondent in regard to the terms of Open Access granted by the Respondent for the period from 01.04.2018.

 

[116 of 2018]
 

 

  10:00

Petition of Sai Wardha Power Generation Limited for seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18.

 

[170 of 2018]
 

 

  10:00

Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.

 

[175 of 2017]
 

 

  10:00

Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) Seeking approval on adoption of tariff for long term procurement of 180MW solar power under ‘Mukhyamantri Sour Krishi Vahini Yojana’ from 2 to 10 MW capacity project connected to distribution network under section 63 of the Electricity Act, 2003 for meeting the solar Renewable Purchase Obligations.

 

[07 of 2019]
 

 

2019
10:00

Petition of Shri Shriram Tukaram Hissal regarding non-compliance of the CGRF Akola, Case No. 32/2018 dated 28.09.2018 by Maharashtra State Electricity Distribution Co. Ltd.

 

[350 of 2018]
 

  

 

  10:00

Petition of Shri Purnaji Omkar Hage regarding non-compliance of the Electricity Ombudsman, Nagpur Order No. 27/2018 dated 23.08.2018 by Maharashtra State Electricity Distribution Co. Ltd.

 

[348 of 2018]
 

  

 

2019
10:00

Petition filed by Bhadreshwar Vidyut Private Limited against wrongful imposition of Cross Subsidy Surcharge (CSS) by the Maharashtra State Electricity Distribution Company Limited (MSEDCL) on the captive users of M/s Bhadreshwar Vidyut Private Limited availing Open Access for the FY 2015-16.

 

[323 of 2018]
 

  

 

  10:00

Petition filed by Bhadreshwar Vidyut Private Limited against wrongful imposition of Cross Subsidy Surcharge (CSS) and Additional Surcharge by the Maharashtra State Electricity Distribution Company Limited (MSEDCL) on the captive users of M/s Bhadreshwar Vidyut Private Limited availing Open Access for the FY 2016-17.

 

[324 of 2018]
 

  

 

  10:00

Petition of Sai Wardha Power Generation Limited for directions to the Respondent in regard to the terms of Open Access granted by the Respondent for the period from 01.04.2018.

 

[116 of 2018]
 

  

 

  10:00

Petition of Sai Wardha Power Generation Limited for seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18.

 

[170 of 2018]
 

  

 

  10:00

Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.

 

[175 of 2017]
 

  

 

  10:00

Petition filed by Bhadreshwar Vidyut Private Limited in accordance with the Order passed by this Hon’ble Commission in Case No. 175 of 2018 dated 22.10.2018 against unlawful action of Maharashtra State Electricity Distribution Company Limited (MSEDCL) in issuing the letter dated 20.12.2018, thereby maintaining its stand as was communicated through their earlier letter dated 15.10.2018 thereby making the captive users of the Petitioner liable to pay Cross Subsidy Surcharge and Additional Surcharge for the power procured for captive use in FY 2017-18.

 

[372 of 2018]
 

  

 

  10:00

Case of INOX Air Products Private Limited seeking directions against Maharashtra State Electricity Distribution Company Limited for wrongful denial of load factor incentive in the bill raised for the month of November, 2018.

 

[368 of 2018]
 

  

 

2019
10:00

Petition of Tata Power Company Limited Review in Case No 265 of 2018 dated 12th September, 2018 in the matter of Revision of transmission Tariff determined in Order dated 22nd July, 2016 in Case No. 91 of 2016 in pursuance of Mid-term Review process.

 

[361 of 2018]
 

  

 

  10:00

Petition filed by M/s. Nath Seeds Limited for non compliance of the Order dt. 05.10.2018 passed by Hon'ble Appellate Authority (u/s 127 of EA 2003) in appeal No. 236/2016.

 

[363 of 2018]
 

  

 

  10:00

Petition of Shri Dilip Bhikaji Dethe against Maharashtra Eastern Grid Power Transmission Company, Akola for non-compliance of the MERC Order and non compliance of Order passed by Sub Divisional Magistrate Order, Buldhana.

 

[359 of 2018]

 

 
2019
10:00

Petition of SEP Energy Private Limited under Sections 9 read with 42 (2) read with 49 read with 61 read with 62 read with 66 read with 86 (1) (b) and (f) read with 86 (3) and (4) of the Electricity Act, 2003 read with MERC (Distribution Open Access) Regulations, 2016.

 

[367 of 2018]
 

  

 

  10:00

Petition of ITC Limited pertaining to wrongful denial/restriction of short term open access applications under Section 42 of the Electricity Act, 2003 read with the provisions of the MERC (Distribution Open Access) Regulations, 2016

 

[370 of 2018]
 

  

 

       
ss

 

Home ABOUT US PHOTO GALLERY ORDERS RULES AND REGULATIONS PRESS RELEASE COMPLAINTS OTHER LINKS CONTACT US

IMPORTANT: Maharashtra Electricity Regulatory Commission to ensure the accuracy of information furnished in this website, MERC does not accept any responsibility or liability for any damage or loss to any person for the result of any action taken on the basis of these information. However, MERC shall be obliged if errors / omissions are brought to its notice for carrying out corrections in the next update.

DESIGNED, DEVELOPED & MAINTAINED BY:
Maharashtra Electricity Regulatory Commission
Best View at 800 * 600 resolution and IE 4 & Above
© Copyright MERC 2002 © Copyright MERC 2002