Events for February, 2019

To view copy of Event Notice Click on Underlined HOUR
2019
10:00

Petition of The Brihan Mumbai Electric Supply & Transport Undertaking for approval for purchase of bilateral power above Average rate approved for FY 2018-19 in the Mid-Term Review Order dated 12.09.2018 in Case No. 203 of 2017 & Regulation 21 of MERC (Multi Year Tariff) Regulations 2015, in respect of Additional Power Procurement

 

[05 of 2019]
 

  

  10:00

Petition filed by Maharashtra State Electricity Distribution Co. Ltd for removal difficulties in implementation of Maharashtra Electricity Regulatory Commission (Standard of Performance of Distribution Licensees, Period for giving supply and determination of compensation) Regulations, 2014 for releasing new connection and determination of compensation for Agriculture Connection.

 

[6 of 2019]
 

  

  10:00

Petition of Maharashtra State Electricity Distribution Company Ltd. for seeking approval on adoption of Tariff for Long Term Procurement of 200 MW Solar Power through MSPGCL from the solar projects (Phase-I) to be set up under ‘ Mukhyamantri Sour Krishi Vahini Yojana’ to meet MSEDCL’s Solar Renewable Purchase Obligations.

 

[15 of 2019]
 

  

  10:00

Application for Impleadment by The Tata Power Company Limited in Case No. 326 of 18 (Petition filed by Jaigad Power Transco Limited under Section 86 of the Electricity Act, 2003 and other applicable provisions of the Electricity Act, 2003.(Recovery of transmission Charges from STU, Reference Case No 162 of 2016).)

 

[MA No. 3 of 2019 in Case No. 326 of 2018]
 

  

2019
10:00

Petition of M/s Shree Cement Limited under section 86 (1) (E) of the Electricity Act, 2003 seeking amendment in Regulation 2(4) and 20.1 of MERC (DOA) Regulations, 2016 and clarification W.R.T simultaneous of Open Access facility and Banking of Power from Co-located RE Power Plant by an eligible Industrial Consumer.

 

[269 of 2018]
 

  

  10:00

Petition of M/s Fabtech Projects & Engineers Limited under Section 142 & 146 for Non-Compliance of the DOA Regulations 2016 by MSEDCL and seeking directions for restoration of the Petitioner’s Contract Demand for the billing month August 2016 and consequential reliefs from the MSEDCL.

 

[272 of 2018]
 

  

  10:00

Petition filed by Maharashtra Metro Rail Corporation Ltd. seeking Review of Order dated 16.01.2018 passed in Case No. 133 of 2016 (Petition of Maharashtra Metro Rail Corporation Ltd. seeking relaxation in the capacity limits for eligibility under the Roof-top Solar PV Net Metering Regulations, 2015.)

 

[286 of 2018]
 

  

  10:00

Petition filed by Adani Power Maharashtra Limited under Section 86 read with Section 63 of the Electricity Act, 2003 and Article 13/10 of the PPAs dated 08.09.2008 and dated 31.03.2010, 09.08.2010 & 16.02.2013 for approval of grant of Carrying Cost.

 

[343 of 2018]
 

  

  10:00

Petition of Maharashtra State Power Generation Company Limited for seeking recovery of additional expenditure to be incurred due to sharing of fly ash transportation cost consequent to Ministry of Environment and Forest, Government of India notification dated 25.01.2016.

 

[371 of 2018]
 

  

2019
10:00

Petition of Shri Purnaji Omkar Hage regarding non-compliance of the Electricity Ombudsman, Nagpur Order No. 27/2018 dated 23.08.2018 by Maharashtra State Electricity Distribution Co. Ltd.

 

[348 of 2018]
 

  

  10:00

Petition of Shri Shriram Tukaram Hissal regarding non-compliance of the CGRF Akola, Case No. 32/2018 dated 28.09.2018 by Maharashtra State Electricity Distribution Co. Ltd.

 

[350 of 2018]
 

  

  10:00

Petition filed by M/s. Nath Seeds Limited for non compliance of the Order dt. 05.10.2018 passed by Hon'ble Appellate Authority (u/s 127 of EA 2003) in appeal No. 236/2016.

 

[363 of 2018]
 

  

  10:00

Petition of SEP Energy Private Limited under Sections 9 read with 42 (2) read with 49 read with 61 read with 62 read with 66 read with 86 (1) (b) and (f) read with 86 (3) and (4) of the Electricity Act, 2003 read with MERC (Distribution Open Access) Regulations, 2016.

 

[367 of 2018]
 

  

  10:00

Petition of ITC Limited pertaining to wrongful denial/restriction of short term open access applications under Section 42 of the Electricity Act, 2003 read with the provisions of the MERC (Distribution Open Access) Regulations, 2016

 

[370 of 2018]
 

  

  10:00

The Petitioner The Tata Power Company Limited (Distribution) has filed under the provision of the Electricity Act, 2003 ("Electricity Act") seeking quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019 and for direction.

 

[MA No. 4 of 2019 in Case No. 25 of 2019]
 

  

  10:00

Petition filled by Adani Electricity Mumbai Limited seeking Quashing/setting aside of Impugned Bill dated 25th January 2019 issued by the Maharashtra State Power Committee (MSPC.)

 

[ 28 of 2019]
 

  

2019
10:00

Petition of M/s Shree Cement Limited under section 86 (1) (E) of the Electricity Act, 2003 seeking amendment in Regulation 2(4) and 20.1 of MERC (DOA) Regulations, 2016 and clarification W.R.T simultaneous of Open Access facility and Banking of Power from Co-located RE Power Plant by an eligible Industrial Consumer.

 

[269 of 2018]
 

  

 

  10:00

Petition filed by Maharashtra Metro Rail Corporation Ltd. seeking Review of Order dated 16.01.2018 passed in Case No. 133 of 2016 (Petition of Maharashtra Metro Rail Corporation Ltd. seeking relaxation in the capacity limits for eligibility under the Roof-top Solar PV Net Metering Regulations, 2015.)

 

[286 of 2018]
 

  

 

  10:00

Petition filed by Adani Power Maharashtra Limited under Section 86 read with Section 63 of the Electricity Act, 2003 and Article 13/10 of the PPAs dated 08.09.2008 and dated 31.03.2010, 09.08.2010 & 16.02.2013 for approval of grant of Carrying Cost.

 

[343 of 2018]
 

  

 

  10:00

Petition of Maharashtra State Electricity Distribution Co. Ltd for Non-Compliance of the Hon’ble MERC Order dated 19.03.2018 (in case no. 114 of 2016) under Section 142 & 146 of EA 2003 by Indian Railways (114 of 2016) Petition of Maharashtra State Electricity Distribution Co. Ltd for a mechanism for recovery of charges on account of over-drawal by Indian Railways)

 

[02 of 2019]
 

  

  10:00

Petition of M/s Fabtech Projects & Engineers Limited under Section 142 & 146 for Non-Compliance of the DOA Regulations 2016 by MSEDCL and seeking directions for restoration of the Petitioner’s Contract Demand for the billing month August 2016 and consequential reliefs from the MSEDCL.

 

[272 of 2018]
 

  

 

  10:00

Petition filed by Maharashtra State Electricity Distribution Co. Ltd for removal difficulties in implementation of Maharashtra Electricity Regulatory Commission (Standard of Performance of Distribution Licensees, Period for giving supply and determination of compensation) Regulations, 2014 for releasing new connection and determination of compensation for Agriculture Connection.

 

[06 of 2019]
 

  

2019
10:00

Addendum Petition of Dodson-Lindblom Hydro Power Private Limited under Section 86 (1) read with Section 62, 142 and 146 of the Electricity Act, 2003 and MERC (Renewable Purchase Obligation, its compliance and implementation of REC Framework), Regulations, 2010 for adjudication of disputes between Petitioner and Respondent No. 1.

 

[251 of 2018]
 

  

  10:00

Petition of Maharashtra State Power Generation Company Limited for seeking recovery of additional expenditure to be incurred due to sharing of fly ash transportation cost consequent to Ministry of Environment and Forest, Government of India notification dated 25.01.2016.

 

[371 of 2018]
 

  

 

  10:00

Petition filed by Jaigad Power Transco Limited under Section 86 of the Electricity Act, 2003 and other applicable provisions of the Electricity Act, 2003.
AND
Miscellaneous Intervention Application filed by Adani Transmission (India) Ltd., in Case No. 326 of 2018

 

[326 of 2018 and MA No. 28 of 2018 in Case No. 326 of 2018]
 

  

  10:00

Petition filed by ITC Limited under section 86(1) (f) of the Electricity Act, 2003 seeking action against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for failure in complying with regulation 26.8 of MERC (Distribution Open Access) Regulations, 2014 and Regulation 20 of MERC (distribution open access) regulations, 2016.

 

[04 of 2019]
 

  

  10:00

Petition for approval for purchase of bilateral power above Average rate approved for FY 2018-19 in the Mid-Term Review Order dated 12.09.2018 in Case No. 203 of 2017 & Regulation 21 of MERC (Multi Year Tariff) Regulations 2015, in respect of Additional Power Procurement

 

[05 of 2019]
 

  

 

  10:00

Petition of Maharashtra State Electricity Distribution Company Ltd. for seeking approval on adoption of Tariff for Long Term Procurement of 200 MW Solar Power through MSPGCL from the solar projects (Phase-I) to be set up under ‘ Mukhyamantri Sour Krishi Vahini Yojana’ to meet MSEDCL’s Solar Renewable Purchase Obligations.

 

[15 of 2019]
 

  

 

2019
10:00

Petition of CLP Wind Farms (India) Private Limited under Section 86(1) (f) of the Electricity Act, 2003 for pertaining to adjudication of disputes between CLP Wind Farms (India) Private Limited and Maharashtra State Electricity Distribution Co. Limited.

 

[355 of 2018]
 

  

 

  10:00

Petition of CLP Wind Farms (India) Private Limited against non-compliance by Maharashtra State Electricity Distribution Company Limited of the Order dated March 16, 2017 of the Hon'ble Commission read with relevant provisions of the Electricity Act, 2003 in Case No. 75 of 2016.

 

[356 of 2018]
 

  

 

  10:00

Petition of CLP Wind Farms (Khandke) Private Limited under Section 86(1) (f) of the Electricity Act, 2003 for pertaining to adjudication of disputes between CLP Wind Farms (Khandke) Private Limited and Maharashtra State Electricity Distribution Co. Limited.

 

[357 of 2018]
 

  

 

  10:00

Petition of CLP Wind Farms (Khandke) Private Limited against non-compliance by Maharashtra State Electricity Distribution Company Limited of the Order dated March 16, 2017 of the Hon'ble Commission read with relevant provisions of the Electricity Act, 2003 in Case No. 74 of 2016.

 

[358 of 2018]
 

  

 

2019
10:00

Petition of CLP Wind Farms (India) Private Limited under Section 86(1) (f) of the Electricity Act, 2003 for pertaining to adjudication of disputes between CLP Wind Farms (India) Private Limited and Maharashtra State Electricity Distribution Co. Limited.

 

[355 of 2018]

 

  10:00

Petition of CLP Wind Farms (India) Private Limited against non-compliance by Maharashtra State Electricity Distribution Company Limited of the Order dated March 16, 2017 of the Hon'ble Commission read with relevant provisions of the Electricity Act, 2003 in Case No. 75 of 2016.

 

[356 of 2018]
 
  10:00

Petition of CLP Wind Farms (Khandke) Private Limited under Section 86(1) (f) of the Electricity Act, 2003 for pertaining to adjudication of disputes between CLP Wind Farms (Khandke) Private Limited and Maharashtra State Electricity Distribution Co. Limited.

 

[357 of 2018]
 
  10:00

Petition of CLP Wind Farms (Khandke) Private Limited against non-compliance by Maharashtra State Electricity Distribution Company Limited of the Order dated March 16, 2017 of the Hon'ble Commission read with relevant provisions of the Electricity Act, 2003 in Case No. 74 of 2016.

 

[358 of 2018]
 
  10:00

Petition of Gateway Terminals India Private Limited under Section 62 (6) of the Electricity Act, 2003 for an unlawful Tariff charged from the Petitioner by the Respondent by way of a Levy of 20% service charge as per Article 8.19 of a License agreement executed between the Petitioner and Respondent.

 

[247 of 2018]
 

  

 

  10:00

Petition of Tata Power Company Limited Review in Case No 265 of 2018 dated 12th September, 2018 in the matter of Revision of transmission Tariff determined in Order dated 22ndJuly, 2016in Case No. 91 of 2016 in pursuance of Mid-term Review process.

 

[361 of 2018]
 

  

 

  10:00

Petition of MSEDCL seeking recovery of annual fixed cost component in respect of MSEDCL for the energy supplied to the State pool, recovery of differential amount to be recovered towards variable rate, removal of anomalies and directions in regards to overdrawal by Mumbai utilities in Balancing and Settlement Mechanism as per provision of ABT Order dated 17.05.2007 in Case No 42 of 2006.

 

[297 of 2018]
 

  

 

  10:00

Petition filed by Shri Hiren Jayendra Nagda under Sections 61 and 62 of Electricity Act, 2003 under Regulations 94, 95, 97 R/w 96 MERC (Conduct of Business) Regulations, 2004, and under Regulations 22,24 of MERC (Electricity Supply Code & Other Conditions of Supply) Regulations, 2005 for removal of difficulty in implementation of Regulation 12.2.

 

[360 of 2018]
 

  

 

  10:00

Petition of ITC Limited pertaining to wrongful denial/restriction of short term open access applications under Section 42 of the Electricity Act, 2003 read with the provisions of the MERC (Distribution Open Access) Regulations, 2016

 

[370 of 2018]
 

  

  10:00

Petition filed by ITC Limited under section 86(1) (f) of the Electricity Act, 2003 seeking action against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for failure in complying with regulation 26.8 of MERC (Distribution Open Access) Regulations, 2014 and Regulation 20 of MERC (distribution open access) regulations, 2016.

 

[04 of 2019]
 

  

2019
10:00

Petition of Gateway Terminals India Private Limited under Section 62 (6) of the Electricity Act, 2003 for an unlawful Tariff charged from the Petitioner by the Respondent by way of a Levy of 20% service charge as per Article 8.19 of a License agreement executed between the Petitioner and Respondent.

 

[247 of 2018]
 
  10:00

Petition of Tata Power Company Limited Review in Case No 265 of 2018 dated 12th September, 2018 in the matter of Revision of transmission Tariff determined in Order dated 22ndJuly, 2016in Case No. 91 of 2016 in pursuance of Mid-term Review process.

 

[361 of 2018]
 
  10:00

Petition of MSEDCL seeking recovery of annual fixed cost component in respect of MSEDCL for the energy supplied to the State pool, recovery of differential amount to be recovered towards variable rate, removal of anomalies and directions in regards to overdrawal by Mumbai utilities in Balancing and Settlement Mechanism as per provision of ABT Order dated 17.05.2007 in Case No 42 of 2006.

 

[297 of 2018]
 
  10:00

Petition filed by Shri Hiren Jayendra Nagda under Sections 61 and 62 of Electricity Act, 2003 under Regulations 94, 95, 97 R/w 96 MERC (Conduct of Business) Regulations, 2004, and under Regulations 22,24 of MERC (Electricity Supply Code & Other Conditions of Supply) Regulations, 2005 for removal of difficulty in implementation of Regulation 12.2.

 

[360 of 2018]
 

  

  10:00

Addendum Petition of Dodson-Lindblom Hydro Power Private Limited under Section 86 (1) read with Section 62, 142 and 146 of the Electricity Act, 2003 and MERC (Renewable Purchase Obligation, its compliance and implementation of REC Framework), Regulations, 2010 for adjudication of disputes between Petitioner and Respondent No. 1.

 

[251 of 2018]
 

  

  10:00

Petition of CLP Wind Farms (India) Private Limited under Section 86(1) (f) of the Electricity Act, 2003 for pertaining to adjudication of disputes between CLP Wind Farms (India) Private Limited and Maharashtra State Electricity Distribution Co. Limited.

 

[355 of 2018]
 

  

  10:00

Petition of CLP Wind Farms (India) Private Limited against non-compliance by Maharashtra State Electricity Distribution Company Limited of the Order dated March 16, 2017 of the Hon'ble Commission read with relevant provisions of the Electricity Act, 2003 in Case No. 75 of 2016.

 

[356 of 2018]
 

  

  10:00

Petition of CLP Wind Farms (Khandke) Private Limited under Section 86(1) (f) of the Electricity Act, 2003 for pertaining to adjudication of disputes between CLP Wind Farms (Khandke) Private Limited and Maharashtra State Electricity Distribution Co. Limited.

 

[357 of 2018]
 

  

  10:00

Petition of CLP Wind Farms (Khandke) Private Limited against non-compliance by Maharashtra State Electricity Distribution Company Limited of the Order dated March 16, 2017 of the Hon'ble Commission read with relevant provisions of the Electricity Act, 2003 in Case No. 74 of 2016.

 

[358 of 2018]
 

  

  10:00

Petition of ITC Limited pertaining to wrongful denial/restriction of short term open access applications under Section 42 of the Electricity Act, 2003 read with the provisions of the MERC (Distribution Open Access) Regulations, 2016

 

[370 of 2018]
 
  10:00

Petition filed by ITC Limited under section 86(1) (f) of the Electricity Act, 2003 seeking action against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for failure in complying with regulation 26.8 of MERC (Distribution Open Access) Regulations, 2014 and Regulation 20 of MERC (distribution open access) regulations, 2016.

 

[04 of 2019]
 

  

  10:00

Petition of The Tata Power Company Limited (Distribution) seeking quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019 and for direction.

 

[25 of 2019]
 

  

  10:00

Petition of Adani Electricity Mumbai Ltd regarding quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019 and for direction.

 

[28 of 2019]
 

  

2019
10:00

Petition of Maharashtra State Electricity Distribution Co. Ltd for Removal of difficulties in implementation of MERC (Net Metering for Roof-Top Solar Photo Voltaic System) Regulations, 2015

 

[20 of 2019]
 

  

  10:00

Petition filed by Aurangabad Industrial Township Limited (AITL) under Section 2(41), Section12, Section 13 of the Electricity Act 2003 and Regulation 8.16.2 of the MERC (General Conditions of Distribution License) Regulations, 2006 for issuance of Special Conditions of Distribution License to Aurangabad Industrial Township Limited (AITL) in pursuance of recommendations of the Government of Maharashtra under Section 13 of the Electricity Act 2003.

 

[29 of 2019]
 

  

2019
10:00

Petition filed by Maharashtra State Power Generation Company Limited (MSPGCL) for review of Order dated 24.10.2018 by Hon’ble Commission in Case No. 186 of 2018 (petition of MSEDCL to review certain issues in the Commission's Order dated 02.05.2018 in Case No. 111 of 2017), under Sections 85 of MERC (Conduct of Business) Regulations, 2004 and under Section 94 of the Electricity Act, 2003.

 

[364 of 2018]
 

  

  10:00

Petition of Vimal Trading Centre against Maharashtra State Electricity Distribution Co. Ltd. for Non-Compliance of CGRF Akola Zone order in complaint No 50/2018 order dated 11.12.2018 and Non-Release of New Connection.

 

[14 of 2019]
 

  

 

  10:00

Petition of Ambabai Yantramag Audyogik Sahakari Sanstha for seeking Non-Compliance of Consumer Grievance Redressal Forum, Kolhapur Zone’s consumer Grievance case No.31/2018-19/Letter dt.207 dated 30 August,2018 under section 142 and section 149 of 2018 electricity act 2003.

 

[16 of 2019]
 

  

 

2019
10:00

Petition of Raj Laxmi Food and Spices against Maharashtra State Electricity Distribution Co. Ltd for Non-Compliance of CGRF Amravati Zone order in complaint No. 24/2018 order dated 11.10.2018 and Non-Release of new connection.

 

[10 of 2019]
 

  

 

  10:00

Petition of Umesh Board and Paper Mills Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd under Regulation 22 of MERC CGRF & EO Regulation due to Non-Compliance of CGRF Aurangabad Zone order in Case No CGRF/AZ/AUC/684/2018/24 order dated 18.09.2018 related to differential amount of continuous non-continuous tariff issue and allied Grievances & thereby to initiate Non-Compliance proceedings under section 142 and 149 of EA 2003

 

[11 of 2019]
 

  

 

  10:00

Petition of Wasim Oil Mill and Ginning Pressing against Maharashtra State Electricity Distribution Co. Ltd for Non-Compliance of CGRF Akola Zone order in complaint No 52/2018 order dated 11.12.2018 and Non-Release of New Connection thereof in the matter of Wasim Oil Mill and Ginning Pressing.

 

[12 of 2019]
 

  

 

  10:00

Petition filed by Cable Corporation of India Ltd. for Seeking directing MSEDCL to comply Hon. CGRF order in respect of consumer M/S. Cable Corporation of India- Consumer No.075949020490

 

[18 of 2019]
 

  

 

2019
10:00

Petition of Laxmi Narayan Udhyog against Maharashtra State Electricity Distribution Co. Ltd. for Non-Compliance of CGRF Akola Zone order in complaint No. 51/2018 order dated 11.12.2018 and Non-Release of new connection.

 

[13 of 2019]
 

  

 

  10:00

Petition filed by Cable Corporation of India Ltd. for directing MSEDCL to comply Hon. CGRF, Nashik order in respect of consumer M/S. Cable Corporation of India- Consumer No.075949020250

 

[17 of 2019]
 

  

 

       
s

 

Home ABOUT US PHOTO GALLERY ORDERS RULES AND REGULATIONS PRESS RELEASE COMPLAINTS OTHER LINKS CONTACT US

IMPORTANT: Maharashtra Electricity Regulatory Commission to ensure the accuracy of information furnished in this website, MERC does not accept any responsibility or liability for any damage or loss to any person for the result of any action taken on the basis of these information. However, MERC shall be obliged if errors / omissions are brought to its notice for carrying out corrections in the next update.

DESIGNED, DEVELOPED & MAINTAINED BY:
Maharashtra Electricity Regulatory Commission
Best View at 800 * 600 resolution and IE 4 & Above
© Copyright MERC 2002 © Copyright MERC 2002